RTE, the French electricity Transmission System Operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the public terrestrial transmission system.
In this context, RTE wishes to entrust services to a certifier for its future offshore platforms.
Date limite
Le délai de réception des offres était de 2021-12-03.
L'appel d'offres a été publié le 2021-11-15.
Objet Champ d'application du marché
Titre: Offshore Platforms Certification
Produits/services: Services de certification📦
Brève description:
“RTE, the French electricity Transmission System Operator, is responsible for the development, implementation and operation of the connection of offshore...”
Brève description
RTE, the French electricity Transmission System Operator, is responsible for the development, implementation and operation of the connection of offshore wind farms to the public terrestrial transmission system.
In this context, RTE wishes to entrust services to a certifier for its future offshore platforms.
The scope of the certification body includes the following tasks
- Certification of the seabed and soil survey for platform location,
- Certification of meteorological and oceanic data for platform design,
- Certification of the employer's specifications for the platforms and specific substructures,
- Certification of the detailed design of the platforms, including all equipment,
- Certification of the substructures based on the EPCIC contractor's design analyses,
- Supervision of fabrication and installation of platforms and substructures,
- Certification of onshore and offshore commissioning and commissioning of platforms
- Any other similar certification services.
Afficher plus Critères d'attribution
Le prix n'est pas le seul critère d'attribution et tous les critères ne sont énoncés que dans les documents de passation de marchés
Durée du contrat, de l'accord-cadre ou du système d'acquisition dynamique
Le délai ci-dessous est exprimé en nombre de mois.
Description
Durée de l'accord: 48
Durée du contrat, de l'accord-cadre ou du système d'acquisition dynamique
Ce contrat est susceptible d'être renouvelé ✅ Description
Description des renouvellements: 4 years renewable 2 times 2 years
Informations sur les limites du nombre de candidats à inviter
Nombre de candidats envisagé: 4
Informations sur les options
Options ✅
Description des options:
“- Independent analysis by the certification body of the structural performance of the substructure developed by EPCI contractors during the detailed design...”
Description des options
- Independent analysis by the certification body of the structural performance of the substructure developed by EPCI contractors during the detailed design phase of the platforms.
- Certification of all or part of the basic design of the platform prior to the EPCI Platform consultation
Informations juridiques, économiques, financières et techniques Conditions de participation
Liste et brève description des conditions:
“The applicant must send with his application :
Applicant established in France :
-An extract from the registration in the trade and company register (Kbis...”
Liste et brève description des conditions
The applicant must send with his application :
Applicant established in France :
-An extract from the registration in the trade and company register (Kbis form), or an identification card proving registration in the trade register (original or copy) dated less than 3 months before the deadline for responses; or a receipt for the declaration filed with a centre for business formalities for legal entities or individuals in the process of registration.
Candidate established outside France:
-a document issued by the authorities holding the professional register or an equivalent document certifying this registration or, for companies in the process of being set up, a document dated less than 3 months from the authority authorised to receive the registration in the professional register and certifying the application for registration in the said register;
-a document mentioning its identity and address or, where appropriate, the details of its fiscal representative in France.
For all candidates:
-A dated and signed declaration on honour justifying that it does not fall within any of the cases of prohibition of tendering mentioned in articles L.2141-1 to L.2141-5 of the order in°2018-1074 of 26 November 2018 relating to the legislative part of the public order code and that it is in good standing with regard to articles L.5212-1 to L.5212-11 of the labour code concerning the employment of disabled workers;
These are, without being exhaustive:
-penalties imposed by a criminal judge relating to corruption in the broad sense, misappropriation of funds, influence peddling, illegal taking of interest, fraud, breach of trust, forgery and use of forgeries, money laundering, participation in a criminal association, for acts of terrorism, for drugs;
-failures to comply with social or fiscal obligations, established either by a judge, or by the authorities responsible for collecting taxes, contributions and social security payments, or by the labour inspection services and similar bodies;
-statements of compulsory liquidation, bankruptcy or legal redress which do not justify the right to continue the activities during the foreseeable period of performance of the public contract, recorded by the commercial court
-violation of the rules relating to the fight against illegal employment, recorded by the labour inspectorate and similar services or reported by the latter to the representatives of the State.
-In the event of legal redress, a copy of the judgment(s) handed down.
Candidate belonging to the EDF Group or the Caisse des Dépôts et Consignations (CDC) Group
In order to ensure compliance with the provisions of Articles L111-10 et seq. of the Energy Code, a candidate controlled directly or indirectly by a company in the EDF or CDC Group must produce in its application file a statement indicating its capital link with one or more companies in the EDF or CDC Group.
These elements, produced in French, must be provided by the individual candidates, by each member of a candidate group and, where applicable, by the subcontractors presented.
-In the event of a conflict of interest, the candidate undertakes to provide evidence of his irrefutable independence in relation to the consultation in question.
Translated with www.DeepL.com/Translator (free version)
“- Prove a turnover of more than €2M for at least one of the previous 3 years (2018, 2019, 2020) and provide financial reports (Balance Sheets and Profit and...”
- Prove a turnover of more than €2M for at least one of the previous 3 years (2018, 2019, 2020) and provide financial reports (Balance Sheets and Profit and Loss Accounts);
- Provide the share of turnover corresponding to the activity, subject of the proposed service, for the previous 3 years (2018, 2019, 2020);
- Provide a brief history of the company and an organisation chart (specifying the number of people employed);
- Present itself in a legal form that allows a clear assessment of its resources, organisation and division of responsibilities;
Afficher plus Capacité technique et professionnelle
Liste et brève description des critères de sélection:
“1/ (Accreditation criteria from EN NF 61400-22)
Accreditation by a national or international accreditation body subject to international assessment of the...”
Liste et brève description des critères de sélection
1/ (Accreditation criteria from EN NF 61400-22)
Accreditation by a national or international accreditation body subject to international assessment of the qualification and competence to carry out the elements of the certification process impartially in accordance with the relevant ISO/IEC publications
elements of the certification process impartially in accordance with the following relevant ISO/IEC publications: ISO/IEC 17020, ISO/IEC 17021, ISO/IEC 17025 and ISO/IEC Guide 65.
2/ References (fully completed or at least manufacturing completed) within the last 8 years for a full EPCIC project certification for an HVAC or HVDC OSS according to EN-IEC-61400-22 (or IECRE OD-501 & 502) of a jacket type substructure and a topside.
3/ References (fully completed or at least fabrication completed) within the last 8 years for a full EPCIC project certification for an HVAC or HVDC OSS according to DNV-ST-0145 (or DNV-OS-J201) where the TSO provides the OSS.
4/ References within the last 8 years for project certification of site conditions and project design basis (including customer requirement specifications) of an EPCIC OSS project according to EN-IEC-61400-22 (or IECRE OD-501 & 502) for a jacket OSS substructure and topside.
5/ Quality certification (ISO 9001 or equivalent)
Please provide a copy of the certificate. Please provide details if certification is in progress.
If not, please provide details of your company's quality management.
6/ Safety certification (VCA, OHSAS 18001 or equivalent)
Provide a copy of the certificate. Please provide details if certification is in progress.
If not, please provide detailed information on the health and safety management in your company.
7/ Written and oral communication skills in English and French (reading, checking and writing documents).
8/ Information security certification (ISO/IEC 27000 or equivalent)
Please provide a copy of the certificate. Please provide details if certification is in progress.
If not, please provide details of your company's information security management.
Afficher plus Conditions de participation
Conditions de participation (capacités techniques et professionnelles):
“- On criterion n°1: (Accreditation criterion from EN NF 61400-22)
Accreditation by a national or international accreditation body subject to international...”
Conditions de participation (capacités techniques et professionnelles)
- On criterion n°1: (Accreditation criterion from EN NF 61400-22)
Accreditation by a national or international accreditation body subject to international assessment of the qualification and competence to carry out the elements of the certification process impartially in accordance with the relevant ISO/IEC publications
elements of the certification process impartially in accordance with the following relevant ISO/IEC publications: ISO/IEC 17020, ISO/IEC 17021, ISO/IEC 17025 and ISO/IEC Guide 65.
- On criterion n°2: Minimum 1 reference (fully completed or at least fabrication completed) within the last 8 years for a complete EPCIC* project certification for an HVAC or HVDC OSS** according to EN-IEC-61400-22 (or IECRE OD-501 & 502) of a jacket type substructure and a topside.
* Certification against DNVGL-ST-0145. The scope shall cover the entire OSS and include the power supply system. The certification service shall include design, manufacture, installation and connection at sea, full commissioning and start-up.
**: OSS minimum 300MW
- On criterion 5: Quality certification (ISO 9001 or equivalent)
Please provide a copy of the certificate. Please provide details if certification is in progress.
If not, please provide detailed information on the quality management in your company.
- On criterion 6: Safety certification (VCA, OHSAS 18001 or equivalent)
Provide a copy of the certificate. Please provide details if certification is in progress.
If not, please provide detailed information on the health and safety management in your company.
- On criterion n°7: Written and oral communication skills in English and French (reading, checking and drafting documents).
Afficher plus
Dépôts et garanties exigés:
“Deposits or bank guarantees may be required and will be indicated in the tender file.”
Principales conditions de financement et modalités de paiement et/ou référence aux dispositions pertinentes qui les régissent:
“Financing from own resources. Payment within 49 days from the date of issue of the invoice (except for specific regulations in terms of payment terms...”
Principales conditions de financement et modalités de paiement et/ou référence aux dispositions pertinentes qui les régissent
Financing from own resources. Payment within 49 days from the date of issue of the invoice (except for specific regulations in terms of payment terms relating to the activity).
Afficher plus
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché:
“RTE reserves the right to ask the grouping to be transformed into a joint venture or with a joint representative when the contract is awarded, insofar as...”
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché
RTE reserves the right to ask the grouping to be transformed into a joint venture or with a joint representative when the contract is awarded, insofar as this transformation is necessary for the proper performance of the contract.
In the case of an application by a grouping, all the documents requested in III.1.1) to III.1.3) must be supplied by each of its members.
Except in the cases provided for in Article R.2142-26 of the Public Procurement Code, the composition of the grouping applying for a call for competition may not be changed between the date of submission of applications and the date of signature of the contract.
Procédure Type de procédure
Procédure négociée avec mise en concurrence préalable
Informations sur la réduction du nombre de solutions ou d'offres au cours de la négociation ou du dialogue
Recours à une procédure par étapes pour réduire progressivement le nombre de solutions à discuter ou d'offres à négocier
Informations administratives
Délai de réception des offres ou des demandes de participation: 2021-12-03
14:00 📅
Langues dans lesquelles les offres ou les demandes de participation peuvent être présentées: anglais 🗣️
Langues dans lesquelles les offres ou les demandes de participation peuvent être présentées: français 🗣️
Le délai ci-dessous est exprimé en nombre de mois.
Délai minimum pendant lequel le soumissionnaire doit maintenir l'offre: 12
Informations complémentaires Informations sur la récurrence
Il s'agit d'un marché récurrent ✅ Informations sur les flux de travail électroniques
Les commandes électroniques seront utilisées
La facturation électronique sera acceptée
Informations complémentaires
“Pre-contractual referral provided for in Articles 5 et seq. of Ordinance No. 2009-515 of 7 May 2009 on the review procedures applicable to public...”
Pre-contractual referral provided for in Articles 5 et seq. of Ordinance No. 2009-515 of 7 May 2009 on the review procedures applicable to public procurement contracts. The appeal must be lodged before the contract is concluded.
Contractual referral provided for in Articles 11 et seq. of Ordinance No. 2009-515 of 7 May 2009 on the review procedures applicable to public procurement contracts.
The appeal must be lodged at the latest on the thirty-first day following the publication in the Official Journal of the European Union of the notice of award of the contract or, for contracts based on a framework agreement or a dynamic purchasing system, following the notification of the conclusion of the contract.
In the absence of publication of the notice or notification, the court may be seised until the expiry of a period of six months from the day following the day of conclusion of the contract pursuant to Article 1441-3 of the Code of Civil Procedure.
Afficher plus Organe de révision
Nom: Tribunal Judiciaire de Nanterre
Adresse postale: 179-191, avenue Joliot-Curie
Commune postale: Nanterre Cedex
Code postal: 92020
Pays: France 🇫🇷
Téléphone: +33 140971010📞
Fax: +33 147243161 📠 Service auprès duquel des informations sur la procédure de recours peuvent être obtenues
Nom: Tribunal Judiciaire de Nanterre
Adresse postale: 179-191, avenue Joliot-Curie
Commune postale: Nanterre Cedex
Code postal: 92020
Pays: France 🇫🇷
Téléphone: +33 140971010📞
Fax: +33 147243161 📠
Source: OJS 2021/S 225-593482 (2021-11-15)