Passation de marchés: Eurotunnel (page 3)

2014-07-08   Supply of GSM-R operational handheld radios and related accessories (Eurotunnel)
Within the context of introducing the GSM-R system on the Concession, Eurotunnel needs to replace its fleet of operational handheld radios with GSM-R handhelds (OPH & GPH) and related accessories (case, batteries, chargers, etc.). Voir la passation de marché »
2014-07-01   Retrofit or Replacement of R22 Gas Chillers Used to cool the Channel Tunnel, French and Uk plants (with opportunity... (Eurotunnel)
Through our program for R22 replacement, we are considering to: either convert the existing chillers (currently cooling power 51 MW) in France / UK to new gas, or purchase new chillers for machines both to cover the need of 40 MW. Implementation of a sea water cooling supplemented with chillers (new or upgraded) can be considered. Voir la passation de marché »
2014-06-10   Fourniture, mise en œuvre et formation d'un progiciel de planification/ordonnancement pour les travaux de... (Eurotunnel)
Fourniture d'un outil de planification des activités de maintenance à court et moyen terme et permettant de prendre en compte entre autre les contraintes suivantes: — les équipes, leurs compétences et leur structure organisationnelle, — le patrimoine des installations, des équipements, — les routes (tournées), — les gammes de maintenance, — les plans de maintenance, — les mécanisme de déclenchement des ordres de travail, — les ordres de travail préventifs et correctif, — les fenêtres d'intervention … Voir la passation de marché »
Fournisseurs mentionnés: Quintiq
2014-06-04   Overhaul of the electric locomotive traction motors (Eurotunnel)
The operation consists of the overhaul of the electric locomotive traction motors, and will include the systematic replacement of the bearings (DE and NDE). 2 types of traction motor are concerned, the traction motors of the 7 MW locomotive fleet which will have incurred approximately 1 600 000 kms at the time of overhaul, and the traction motors of the 5.6 MW loco fleet and which will have incurred approximately 3 000 000 kms at time of overhaul. The traction motors shall be overhauled in the workshops … Voir la passation de marché »
2014-06-04   Purchase of freight wagons - Eurotunnel intends to increase its Freight Rolling Stock capacity by acquizing... (Eurotunnel)
Purchase of freight wagons for loading and transporting trucks through the Channel Tunnel. Eurotunnel will be able to provide diverse components in particular the brakes and coupler systems for incorporation by the wagon designer / builder. Voir la passation de marché »
Fournisseurs mentionnés: WBN Waggonbau Niesky
2014-05-30   Replacement of Halon 1301 in technical rooms in the Service Tunnel and on the Terminal UK/FR (Eurotunnel)
According to Regulation (EU) No. 744/2010 of the European Commission, Eurotunnel is required to replace its Halon gas fire extinguishing agents on all of its fixed installations on its Concession (in technical rooms in the Service Tunnel and Terminals) before 31.12.2016. Voir la passation de marché »
2014-05-26   Partial replacement of the main line firefighting valves of the Service Tunnel associated with Viking Vohnson pipe... (Eurotunnel)
LOT 1 (Firm) : supply, delivery and installation of 1/3 existing valves + 15 % Viking Johnson pipe couplers 150 mm Diameter, Class 300, lugged firesafe metal seated butterfly valves with a WCB carbon steel body, ASTM A351 stainless steel disc EN 10088-3 stainless steel shaft and AISA 316 stainless steel seat with graphite packing, face to face dimension 70 mm, bare shaft. To suit existing Mastergear Type MZ / MZF operator gearboxes. All valves to come with material certs & to be warranted. To include all … Voir la passation de marché »
2014-05-07   Truck Heigh Measurement System and Antenna Positioning Detection System (Eurotunnel)
Eurotunnel envisages to put in place a truck height measurement system and antenna positioning detection system on the French and UK terminal before trucks loading on trains. Voir la passation de marché »
2014-05-07   Replacement of Remote Telemetry Unit (RTU) (Eurotunnel)
Replacement of Remote Telemetry Unit (RTU) on the Engineering Management System (EMS) on the Eurotunnel concession (FR and UK sites + tunnels). Voir la passation de marché »
2014-02-25   Terminal 2014 site France travaux de démolition, de voirie, assainissement, réseaux, systèmes de péage et de génie... (Eurotunnel)
La partie du projet Terminal 2014 côté France est située sur le terminal fret desservie par la sortie 42a de l'autoroute A16, qui contrairement au côté UK est implanté sur un site distinct de celui du terminal passagers (sortie 42b). Eurotunnel a décidé de réorganiser les zones d'accès , de réception des poids lourds par un réaménagement complet du Terminal actuel. Voir la passation de marché »
2014-01-30   Servicing pneumatic equipment (Eurotunnel)
Work to be carried out in order to renovate the pneumatic equipment installed on Eurotunnel rolling stock. Eurotunnel currently has 2 different types of rolling stock : Freight Shuttles 6 BREDA Shuttles 9 ARBEL Shuttles Passengers Shuttles 9 Bombardier Shuttles The work will be divided in two lots : Lot No 1: Pneumatic equipment designed by Sab Wabco / Faiveley – 65 items. Lot No 2: Pneumatic equipment designed by Dehousse / Knorr / Westinghouse – 41 items. Voir la passation de marché »
2014-01-21   Maintenance of railway equipment terminals FR and UK and two tunnels-Channel fixed link (Eurotunnel)
Maintenance of railway equipment terminals FR and UK and two tunnels-Channel fixed link services including maintenance of the railway works and maintenance of switches work, emergency response if needed strategic such as critical equipment for commercial and technical assistance in project supervision. Voir la passation de marché »
2014-01-21   Completion of maintenance grading and layout of the track (Eurotunnel)
Completion of maintenance grading and layout of the track by operations of tamping dressage heavy mechanical railway and switches maximum tangent 1/21 with concrete sleepers on the French and UK terminals. The company is also in charge of making preparations of the tamping / heavy mechanical dressage (mapping), work tamping and assistance upstream and downstream machines. Eurotunnel organize approximately two campaigns per year. Voir la passation de marché »
2014-01-20   Assemblage et montage de pagodes sur les véhicules Arbel (Eurotunnel)
Assemblage et montage de 148 pagodes sur les véhicules Arbel. Tranche ferme : Assemblage et montage de 16 pagodes. Tranche optionnelle : Assemblage et montage de 132 pagodes. Voir la passation de marché »
2014-01-17   Online and offline media planning and buying for the UK, France, Belgium, Netherlands and German markets (Eurotunnel)
The agency will have overall responsibility for all online and offline media planning and buying. The agency will also need to have market leading expertise in the earned media landscape. The agency's objectives are: 1. to provide local knowledge, expertise and advice to the marketing team on all paid and earned media channels for the UK, France, Belgium, Netherlands and German markets. 2. to propose media strategies in response to Eurotunnel Le Shuttle's commercial strategy in order to grow revenues and … Voir la passation de marché »
2013-12-17   Services de téléphonie fixe et mobile (Eurotunnel)
Services de téléphonie fixe et mobile. Voir la passation de marché »
Fournisseurs mentionnés: Orange
2013-11-29   Replacement of 41 locomotive air-conditioning sets (Eurotunnel)
Eurotunnel has a fleet of 41 air-conditioning sets fitted to its locomotives. These air-conditioning sets use a R22 refrigerant which can no longer be used in air-conditioning sets from 1.1.2015. The task involves conducting a study and the replacement by 41 new air-conditioning sets. Voir la passation de marché »
2013-11-08   Supply of bearings for the Eurotunnel carrier wagon axle boxes (Eurotunnel)
Supply of bearings for the Eurotunnel freight and passenger wagon axle boxes. Voir la passation de marché »
Fournisseurs mentionnés: Shaeffler SKF
2013-10-25   Restoration of the kinematic connections of the bogies (Breda freight shuttles and passengers shuttles, AMC and... (Eurotunnel)
The project consists in the restoration of the kinematic connections of the bogies (Breda freight shuttles and passengers shuttles, AMC and locomotives bogies) by replacement with identical or equivalent elastic articulations. Service of Installation and removal of the main parts supplied by EUROTUNNEL. Operations will be realized in the maintenance workshop in Coquelles in France. Voir la passation de marché »
Fournisseurs mentionnés: ADF
2013-10-23   Replacement of staff uniforms (Eurotunnel)
Supply of uniforms for operations and maintenance staff. Voir la passation de marché »
Fournisseurs mentionnés: FLORY MULLIER LOCOCLUB Logoclub
2013-10-22   Replacement of the interconnecting rubber plate of passengers vehicles, including design study, prototype phase and... (Eurotunnel)
Eurotunnel decided to replace the interconnecting rubber plate of these passengers vehicles. Voir la passation de marché »
2013-09-23   Signalling assistance associated with rail replacement in the running tunnels (Eurotunnel)
Under its maintenance plan, Eurotunnel is planning to replace the rails in the tunnels. The replacement programme will take place in 3 phases, i.e. during the first quarter of 2014, 2015 and 2016. During each phase, 33 000 m of rails will be replaced according to a scenario chosen by Eurotunnel. Signalling assistance covers the completion of the following work: – Removal work prior to rail replacement. – Installation work on completion of the rail replacement. – Track circuit tests. Voir la passation de marché »
2013-09-17   Maintenance, repair and installation services (Eurotunnel)
To provide maintenance, repair and installation services for the Eurotunnel Concession in France, UK and 3 tunnels. To provide maintenance and repair services for all buildings (retail, maintenance, and offices), mechanical and electrical equipment. The EUROTUNNEL site in France has 120 buildings differing in type and use. Three major categories of buildings were defined to prepare the maintenance plan according to the use of the structures. Administrative buildings (15 units) These buildings are used … Voir la passation de marché »
2013-08-06   Exploitation et/ou maintenance des stations d'épuration et réseaux divers (Eurotunnel)
Exploitation et/ou maintenance des installations: réseaux eaux usées, stations d'épuration, réseaux de drainage, réseau eau potable incendie et réseau gravitaire puits de Sangatte. Voir la passation de marché »
2013-07-24   Assistance for Channel Tunnel and Terminal Track Maintenance Grinding (Eurotunnel)
Assistance for Channel Tunnel and Terminal Track Maintenance Grinding. The Work involves rail grinding on the Eurotunnel Concession using the necessary resources possibly including one or more trains and qualified technical personnel. Voir la passation de marché »
Fournisseurs mentionnés: Speno
2013-07-19   Maintenance des voiries et réseau de drainage du terminal France (Eurotunnel)
Maintenance des voiries et réseau de drainage du terminal France. Travaux et contraintes liées à la maintenance des voiries et réseau de drainage du terminal France. Sont concernés pour une part les travaux courants de réfection de rénovation de remise en état et d'entretien des chaussées et d'autre part l'entretien des réseaux divers. La spécification technique définit les modalités d'exécution, des travaux ainsi que les contraintes liées à l'exploitation du terminal. L'entreprise aura les compétences … Voir la passation de marché »
2013-07-11   Coupler drawbar replacement on Eurotunnel shuttles coupling system (Eurotunnel)
Coupler drawbar replacement on Eurotunnel shuttles coupling system. The operation will take place on the Coquelles site between 2014 and 2016. The operation consists in the maintenance of the coupling system on EUROTUNNEL shuttles a) Disassembly and reassembly of 638 coupling systems according to our maintenance procedures. b) Revision of 141 couplers type 10, 297 couplers type SP and 98 couplers according to our maintenance procedures c) Replacement of 576 coupler drawbars according to our maintenance … Voir la passation de marché »
2013-07-11   Coupler drawbar replacement on Eurotunnel shuttles coupling system (Eurotunnel)
Coupler drawbar replacement on EUROTUNNEL shuttles coupling system The operation will take place on the Coquelles site between 2014 and 2016. The operation consists in supplying 576 coupler drawbars in order to replace the existing ones on Eurotunnel Pax vehicles The delivrery of coupler drawbars will be staggered over 3 years in accordance with the planning of maintenance of our véhicles. Voir la passation de marché »
2013-06-25   Opérations de transport et de traitement des déchets du Terminal France jusqu'au lieu d'élimination finale (Eurotunnel)
Opérations de transport et de traitement des déchets du Terminal France jusqu'au lieu d'élimination finale. Voir la passation de marché »
2013-06-21   Gestion et réalisation d'opérations de maintenance de premier niveau et Services courrier (Eurotunnel)
Gestion et réalisation d'opérations de maintenance de premier niveau et Services du courrier. Voir la passation de marché »
2013-06-14   Replacement of fluorescent tubes with LED tubes on the passengers shuttles (Eurotunnel)
Supply and installation of LED tubes to be fitted in place and stead of the existing fluorescent tubes in the Eurotunnel passenger shuttles. This operation will be carried out on the Eurotunnel site. Voir la passation de marché »
Fournisseurs mentionnés: Optarget SNEF
2013-06-04   The design, manufacture, supply and installation of new machine-welded metal floor extremities for the BREDA "1st... (Eurotunnel)
The design, manufacture, supply and installation of new machine-welded metal floor extremities for the BREDA "1st generation" HGV carrying railway wagons and removal of the existing floors. The Contractor is responsible for: — Analysing documents transmitted, — On-site surveys, — Full detailed and working designs, — Design calculations, — Drawings and manufacturing packages, — Dismantling underbody equipment on the ET site (if necessary), — Reassembling underbody equipment in its original position (if … Voir la passation de marché »
Fournisseurs mentionnés: Friedlander
2013-05-07   Rail replacement works in tunnels (Eurotunnel)
Eurotunnel will start from october 2013 on a period of around 30 months a rail replacement program in the Concession Tunnels. This program will be splitted in 3 campaigns which will probably take place in each first quarter of 2014, 2015 and 2016 years During each campaign an average of 33000 lm of track will be replaced on the basis of a working access scenario chosen by EUROTUNNEL when granting the contract. The tender and specifically the technical specifications which will be provided to the … Voir la passation de marché »
2013-04-26   STUDY, SUPPLY AND INSTALLATION OF A NEW DESIGN FOR FIRE PROTECTION SYSTEMS ON-BOARD THE TOURIST SHUTTLE WAGONS (Eurotunnel)
In accordance with its policy and commitment to sustainable development, Eurotunnel intends to remove the Halon 1301 fire extinguishing system which equips the Eurotunnel Tourist Shuttle wagons for the transport of vehicles and passengers on both sides of Channel. Eurotunnel would like to take this opportunity to review generally the design of Fire Detection, Extinguishing and Protection systems on board the wagons. The details of the mission and the expected goals are recorded in a specification (CCF), … Voir la passation de marché »
2013-04-02   Maintenance of IT Applications "ISIS, CIS, ICIS" (Eurotunnel)
Maintenance of different IT applications on our site or in remote comprising : the technical assistance, a part of the corrective maintenance and the change requests. In option some developments could be requested and added to the contract. ISIS: — Manage the informations of the missions (trains). — Manage the loading status of the mission. — Give to ICIS the change of the missions. — Manage the UK and Fr terminals. ICIS and CIS: — Manage the list of the departure to display. — Maintain up to date the … Voir la passation de marché »
2012-12-14   Rail fastening parts: flange screw for rail fastening (Eurotunnel)
Eurotunnel will start a rerailing in the tunnels campaign from september 2013 over a average period of 36 months. For this operation the needs of: 550 000 flange screw with rectangular head diam 18 mm +/- 20 %; 700 000 phenolic joint; 700 000 O'rings will be necessary over the 36 months on the basis of a detailed planning which will be included in the tender. For information the first delivery of parts will be in july 2013 for an average quantity of 15 % of the total, the remaining being splitted over … Voir la passation de marché »
2012-12-14   Rail fastening parts: isolant clips for rail fastening (Eurotunnel)
Eurotunnel will start a rerailing in the tunnels campaign from september 2013 over a average period of 36 months. For this operation the needs of 550 000 isolant clips +/- 20 % will be necessary over the 36 months on the basis of a detailed planning which will be included in the tender. For information the first delivery of parts will be in july 2013 for an average quantity of 15% of the total , the remaining being splitted over the 36 months. For the elastic parts and isolant parts the technical … Voir la passation de marché »
2012-12-14   Rail Fastening Parts : Rails Pads For Rail Fastening (Eurotunnel)
Eurotunnel will start a rerailing in the tunnels campaign from september 2013 over a average period of 36 months For this operation the needs of 350 000 rail pads will be necessary over the 36 months on the basis of a detailed planning which will be included in the tender For information the first delivery of parts will be in july 2013 for an average quantity of 15 % of the total , the remaining being splitted over the 36 months For the elastic parts and isolant parts the technical specifications will … Voir la passation de marché »
2012-12-14   Rail Fastening Parts : Spring Blade for Rail Fastening (Eurotunnel)
Eurotunnel will start a rerailing in the tunnels campaign from september 2013 over a average period of 36 months. For this operation the needs of 550 000 lower and upper spring +/- 20 % will be necessary over the 36 months on the basis of a detailed planning which will be included in the tender. For information the first delivery of parts will be in July 2013 for an average quantity of 15 % of the total , the remaining being splitted over the 36 months. For the elastic parts and isolant parts the … Voir la passation de marché »
2012-12-14   Rails supply and delivery (Eurotunnel)
Eurotunnel will start a rerailing in the tunnels campaign from september 2013 over a average period of 36 months. For this operation a average rail length of 195 000 m (12000 T) will be necessary over the 36 months period. A detailed planning will be included in the tender dossier. Various type of rails could be choosen depending of the steel metalurgical choices. For information the first delivery will be in september 2013 for an average 15% of the total quantity , the remaining quantity will be … Voir la passation de marché »
2012-11-29   Replacement of the hot box and binding brake detectors (Eurotunnel)
Replacement of the hot box detectors (DBCs) and binding brake detectors (DFSs) on the concession. These systems are intended to pick up any abnormal or dangerous overheating of the train axle boxes as well as any abnormal overheating due to a bound brake. This system consists of: — 8 measuring stations installed on the main tracks to measure the temperature of the above-mentioned elements and transmit it to the processing station, — a central station, which warns the operative at the control centre that … Voir la passation de marché »
2012-11-19   Supply of new brakes disc cylinders for passenger and Arbel Shuttles (Eurotunnel)
Supply of new brakes disc cylinders for passenger and Arbel Shuttles. Lot 1. The prototyping of the new brakes cylinders for Arbel shuttles - Quantity 18. Lot 2. Supply new brakes cylinders for Arbel shuttles - Quantity 336. Lot 3. The prototyping of the new brakes cylinders for passangers shuttle quantity 40. Lot 4. Supply of new brakes cylinders for passangers shuttles - quantity 777. Voir la passation de marché »
Fournisseurs mentionnés: Freinrail
2012-11-09   Supply of 2 Telescopic Handlers With Load Capacity Of 16 Tonne (Eurotunnel)
Supply of 2 telescopic handlers with load capacity of 16 tonne. Required to carryout numerous loading and maintenance activities Eurotunnel are presently looking to purchase 2 telescopic handlers with load capacities of approximately 16 tonnes. 1) The first machine is required with standard attachments and two sets of bespoke attachments Standard attachments: — floating pallet forks set of 2, — excavating bucket without teeth, — attachment quick release hydraulic couplings. Bespoke attachments: 1) Snow … Voir la passation de marché »
2012-10-12   Supply and Installation of a train driving simulator for "the railways training center", located in Coquelles France (Eurotunnel)
Supply and Installation of a train driving simulator for "the railways training center", located in Coquelles France. Voir la passation de marché »
2012-10-05   Design and supply of brake shoes to replace cast iron shoes actually in utilisation (Eurotunnel)
Design and supply of brake shoes to replace cast iron shoes actually in utilisation. Firm Tranche: Study and prototyping of a new type of brake shoe which will permit the replacement of the actual cast iron brake shoes in utilisation. Approximative quantity 560. Optional tranche: Supply of (new design) brake shoes to re-equip the Arbel Freight Shuttles. Approximative quantity 4576. Voir la passation de marché »
2012-08-02   Interior refursbishment of 11 Freight Shuttle passenger coaches (AMC = Amenity Coach) (Eurotunnel)
Interior refurbishment of 11 Freight Shuttle passenger coaches (AMC = Amenity Coaches); The objective of the refurbishment is to increase the number of seats, to replace the existing seats with 54 new seats of 2nd Class level comfort and trim, to install a "Bistro" zone with automatic vending machines, raised level tables for standing consumption of refreshments, and 6 foldaway seats, the installation of an onboard video system, the reconditioning of floor surfaces, the application of adhesive decorative … Voir la passation de marché »
2012-07-31   Maintenance of it applications (SAP and ORACLE) (Eurotunnel)
Corrective and progressive maintenance on SAP modules and databases Oracle. Analysis and programmation on bespoke databases and on SAP modules: SAP ECC6 (Version EHP5) modules MM, QM, FI, CO, CFM, PM, CS, SD, EH& S, CRM 2007, SAP PI, SAP BI7 and on few Oracle applications in VB 6. Voir la passation de marché »
Fournisseurs mentionnés: UNIS
2012-07-09   Replacement of programmable logic controlers (PLC) on eurotunnel concession (sites FR and UK + tunnels) (Eurotunnel)
Treatment of the obsolescence of the PLC: study, proof of concept (prototype) test platform and installation for various subsystems subject of the lots described here after. The quantities of the lots can be adjusted according to the economic and technical constraints. Voir la passation de marché »
2012-06-15   Works Supervision Service concerning the Infrastructure Works of the Freight Zones on the Coquelles and Folkestone Terminals (Eurotunnel)
Works Supervision Mission for the implementation of Civil Works, Electrical supply, approach lance and toll booth zone equipment including establishment of dosiers for statutory compliance. Missions APD (Primary Study), DCE, etc, for the following lots: Lot 1: Works Supervision on the French Terminal at Coquelles. Lot 2: Works Supervision on the British Terminal at Folkestone. Voir la passation de marché »