Nuclear Third Party Liability Insurances and Claims Handling
1) EDF SA NTPL Programme — Renewal under current Paris convention on Third party liability in the Field of nuclear energy, as per 18.2.2019 — French Nuclear Installations (EDF SA only) — Lot 0
2) EDF Group NTPL Programmes — Inception under Revised Paris Convention on Third party liability in the Field of nuclear energy (2004 Protocol) — French nuclear installations (EDF SA — Socodei — Framatome); UK nuclear installations (EDF Energy — Cyclife); Swedish nuclear installation (Cyclife); Belgian nuclear installation (FBFC International). Lots 1 to 6
3) Claims Handling IT system. Lot 7
4) Claims Handling adjusters in connection with each programme implemented according to Lot 0 to 6. Lots 8 to 12
5) Tort law for radioactive risks — Lots 13 to 14
Date limite
Le délai de réception des offres était de 2018-07-02.
L'appel d'offres a été publié le 2018-06-11.
Qui ?
Qu'est-ce que c'est ?
Où ?
-
•
Belgique/België
-
•
France
-
•
Sverige
-
•
United Kingdom
Historique des marchés publics
Date |
Document |
2018-06-11
|
Avis de marché
|