IFA2 Interconnector Project Insurance

Reseau de Transport de l'Electricite

This contract notice is for the insurance policies required for the IFA2 Interconnector project. This will comprise of Construction All Risks including terrorism, Delay in Start Up Insurance, Third Party Liability Insurance, Environmental Impairment Liability Insurance and any others that may be required for the project.
The IFA2 Interconnector is a 1000MW, 400kV HVDC link from Chilling in Hampshire, to Tourbe in Normandy. The link is planned to become operational during 2020 and the total length of the link will be ~240km. The project also comprises two converter stations which are based on VSC technology.
The project will be developed by National Grid and Réseau de Transport d'Electricité (RTE), who will each own 50 percent. National Grid is a major UK company which owns and manages gas and electricity infrastructure in the UK and in the northeastern US. RTE is the electricity transmission system owner and operator in France.

Date limite
Le délai de réception des offres était de 2016-10-19. L'appel d'offres a été publié le 2016-09-19.

Fournisseurs
Les fournisseurs suivants sont mentionnés dans les décisions d'attribution ou dans d'autres documents relatifs aux marchés publics :
Qui ?

Qu'est-ce que c'est ?

Où ?

Historique des marchés publics
Date Document
2016-09-19 Avis de marché
2017-05-02 Avis d'attribution de marché