Framework agreement related to basic design to be carried out with regard to the floating sub-structures, the stationkeeping systems, the inter-array cables and construction and installation's methods for the following contracting entities acting as a purchasing group: Parc Eolien Offshore de Provence Grand Large SAS and Nenuphar SA
Basic design to be carried out with regard to the floating sub-structures, the stationkeeping systems and the inter-array cables cable, including site and project adaptation to:
— 1 prototype near of Fos sur Mer;
— Pilot Farm near of Fos sur Mer.