Under the new Lyon-Turin railway link project, TELT society, as a contracting entity, is the public developer in charge of building and managing the cross-border section of the future infrastructure. The aim of this public procurement contract is to carry out construction works under operational worksites n. 5 (digging the base tunnel from the Villarodin-Bourget/Modane decline), n. 6/7 (digging the base tunnel from the La Praz and Saint-Martin-la-Porte declines) and n. 8 (digging the base tunnel from the Villard-Clément gates). Each lot of this public procurement contract is a mixed single-contractor framework contract, i.e. a framework contract with purchase orders and follow-on contracts.
Date limite
Le délai de réception des offres était de 2019-05-28.
L'appel d'offres a été publié le 2019-03-12.
Fournisseurs
Les fournisseurs suivants sont mentionnés dans les décisions d'attribution ou dans d'autres documents relatifs aux marchés publics :
Avis de marché (2019-03-12) Objet Champ d'application du marché
Titre: Travaux de construction de tunnels ferroviaires
Numéro de référence: T7
Brève description:
Under the new Lyon-Turin railway link project, TELT society, as a contracting entity, is the public developer in charge of building and managing the cross-border section of the future infrastructure.
The aim of this public procurement contract is to carry out construction works under operational worksites n. 5 (digging the base tunnel from the Villarodin-Bourget/Modane decline), n. 6/7 (digging the base tunnel from the La Praz and Saint-Martin-la-Porte declines) and n. 8 (digging the base tunnel from the Villard-Clément gates).
Each lot of this public procurement contract is a mixed single-contractor framework contract, i.e. a framework contract with purchase orders and follow-on contracts.
Under the new Lyon-Turin railway link project, TELT society, as a contracting entity, is the public developer in charge of building and managing the cross-border section of the future infrastructure.
The aim of this public procurement contract is to carry out construction works under operational worksites n. 5 (digging the base tunnel from the Villarodin-Bourget/Modane decline), n. 6/7 (digging the base tunnel from the La Praz and Saint-Martin-la-Porte declines) and n. 8 (digging the base tunnel from the Villard-Clément gates).
Each lot of this public procurement contract is a mixed single-contractor framework contract, i.e. a framework contract with purchase orders and follow-on contracts.
Métadonnées de l'avis
Langue originale: anglais 🗣️
Type de document: Avis de marché
Nature du marché: Marché de travaux
Réglementation: Union européenne, avec participation des pays de l'AMP
Vocabulaire commun pour les marchés publics (CPV)
Code: Travaux de construction de tunnels ferroviaires📦
Code CPV supplémentaire: Travaux de construction de tunnels ferroviaires📦 Lieu d'exécution
Région NUTS: Savoie
🏙️
Procédure
Type de procédure: Procédure négociée
Type de soumission: Soumission pour un ou plusieurs lots
Critères d'attribution
Offre la plus économique
Pouvoir adjudicateur Identité
Pays: France 🇫🇷
Type de pouvoir adjudicateur: Service d'utilité publique
Nom du pouvoir adjudicateur: Tunnel Euralpin Lyon Turin SAS
Adresse postale: Savoie Technolac - Bâtiment Homère — 13 allée du Lac de Constance — CS 90281
Code postal: 73375
Commune postale: Le Bourget-du-Lac
Contact
Adresse Internet: http://www.telt-sas.com🌏
Courrier électronique: fonction.contrats@telt-sas.com📧
Téléphone: +33 479685650📞
Fax: +33 479685683 📠
URL des documents: http://telt.achatpublic.com/accueil/🌏
URL pour la participation: http://telt.achatpublic.com/accueil/🌏
Référence Dates
Date d'envoi: 2019-03-12 📅
Date limite de soumission: 2019-05-28 📅
Date de publication: 2019-03-15 📅
Identifiants
Numéro d'avis: 2019/S 053-123099
Numéro JO-S: 53
Informations complémentaires
The framework contract of this lot n. 1 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. above is not contractually binding. This is merely a rough guide calculated on a base tunnel section length of approximately 21,9 km.
Each purchase order or follow-on contract shall contain a contractual period of execution.
The framework contract of this lot n. 1 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. above is not contractually binding. This is merely a rough guide calculated on a base tunnel section length of approximately 21,9 km.
Each purchase order or follow-on contract shall contain a contractual period of execution.
Objet Champ d'application du marché
Brève description:
Under the new Lyon-Turin railway link project, TELT society, as a contracting entity, is the public developer in charge of building and managing the cross-border section of the future infrastructure.
The aim of this public procurement contract is to carry out construction works under operational worksites n. 5 (digging the base tunnel from the Villarodin-Bourget/Modane decline), n. 6/7 (digging the base tunnel from the La Praz and Saint-Martin-la-Porte declines) and n. 8 (digging the base tunnel from the Villard-Clément gates).
The aim of this public procurement contract is to carry out construction works under operational worksites n. 5 (digging the base tunnel from the Villarodin-Bourget/Modane decline), n. 6/7 (digging the base tunnel from the La Praz and Saint-Martin-la-Porte declines) and n. 8 (digging the base tunnel from the Villard-Clément gates).
Each lot of this public procurement contract is a mixed single-contractor framework contract, i.e. a framework contract with purchase orders and follow-on contracts.
Nombre maximal de lots attribués à un seul soumissionnaire: 2
Informations sur les lots:
If a bidder presents the winning offer for 3 lots, it may be awarded at most 2 lots according to the following combinations: lots n.1 and n.3, or lots n.2 and n.3. If however, the bidder presents the winning offer for lots n.1 and n.2, it will only be awarded one of the 2. Conditions of application: see VI.3.
If a bidder presents the winning offer for 3 lots, it may be awarded at most 2 lots according to the following combinations: lots n.1 and n.3, or lots n.2 and n.3. If however, the bidder presents the winning offer for lots n.1 and n.2, it will only be awarded one of the 2. Conditions of application: see VI.3.
Awarding rules for the lots will be included in the procurement documents.
Intitulé du lot: Operational Worksite 5: Construction of the Tunnel from the Villarodin-Bourget/Modane Decline
Numéro du lot: 1
Brève description:
The activities of this lot n. 1 include the transfer of existing facilities (especially declines and Avrieux shaft) and the construction of all future base tunnel facilities over a distance of roughly 21.9 km for each tube, running from Modane up to the adjoining section in Italy.
The activities of this lot n. 1 include the transfer of existing facilities (especially declines and Avrieux shaft) and the construction of all future base tunnel facilities over a distance of roughly 21.9 km for each tube, running from Modane up to the adjoining section in Italy.
The works to be carried out by means of purchase orders may especially include:
— construction of the Villarodin-Bourget platform (fence, earthworks, dikes, power supply, site ventilation, pit water treatment, other site facilities),
— civil engineering works on the Modane safety site and the related service galleries (digging using conventional methods, supports, waterproofing, and surfacing/paving) from the foot of the Villarodin-Bourget/Modane decline,
— civil engineering works on the base tunnel (digging using conventional methods and/or tunnel boring machine, supports, waterproofing and surfacing/paving) as well as the related intertube galleries and service/utility rooms,
— civil engineering works to reconstruct the Villarodin-Bourget/Modane decline in its final dimensions,
— construction of all facilities needed to provide site logistics and backup (temporary or permanent facilities, underground works, utilities, etc...),
— construction of sites for pre-classification of excavated materials for subsequent reuse and of sites for the temporary or permanent storage of materials deriving from underground earthworks and excavations (moulin and tierces sites),
— the stocking and transportation of excavated materials via conveyor belt.
Works to be carried out through follow-on contracts (initiated or not depending on the operational date of the lot in charge of testing, sorting and reusing the excavation materials) involve the management and use of excavation materials, which may include all or some of the following services:
Works to be carried out through follow-on contracts (initiated or not depending on the operational date of the lot in charge of testing, sorting and reusing the excavation materials) involve the management and use of excavation materials, which may include all or some of the following services:
— testing, sorting and final classification of excavation materials,
— transfer of excavation materials to temporary or permanent disposal sites,
— earthworks to allow for permanent storage on the tierces site.
Follow-on contracts may also allow for civil engineering works to be carried out to construct tunnel structures that will interface with future equipment contracts.
The scope of this “Operational Worksite 5" lot may undergo limited changes in relation to the perimeters of “Operational Worksite 4" to the east and “Operational Worksite 6" to the west, based on the actual progress of each of the worksites and the need to keep the project implementation programme within the expected timeframes.
The scope of this “Operational Worksite 5" lot may undergo limited changes in relation to the perimeters of “Operational Worksite 4" to the east and “Operational Worksite 6" to the west, based on the actual progress of each of the worksites and the need to keep the project implementation programme within the expected timeframes.
Valeur estimée hors TVA: 1 000 000 000 EUR 💰
Durée de l'accord: 102 mois
Nom du projet ou programme financé par l’UE: TENT-T (Trans-European Transport Network): project n. 2014-EU-TM-0401-M
Informations complémentaires:
The framework contract of this lot n. 1 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. above is not contractually binding. This is merely a rough guide calculated on a base tunnel section length of approximately 21,9 km.
The framework contract of this lot n. 1 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. above is not contractually binding. This is merely a rough guide calculated on a base tunnel section length of approximately 21,9 km.
Each purchase order or follow-on contract shall contain a contractual period of execution.
Intitulé du lot: Operational Worksite 6/7: Construction of the Tunnel from the La Praz and Saint-Martin-la-Porte Declines
Numéro du lot: 2
Brève description:
The activities of this lot n. 2 include the transfer of existing facilities (especially declines) and the construction of all future base tunnel facilities over a distance of roughly 23,1 km, running from Saint-Martin-la-Porte up to Modane.
For operational worksite 6 (CO6):
— construction of the La Praz platform (fence, earthworks, dikes, power supply, site ventilation, pit water treatment, other site facilities),
— civil engineering works on the La Praz safety site and the related service galleries (digging using conventional methods) from the foot of the La Praz decline,
— civil engineering works on the base tunnel section of approximately 9 km long between the La Praz caverns and the Modane safety site (digging using conventional methods and/or tunnel boring machine) as well as the related intertube galleries and service/utility rooms,
— civil engineering works on the base tunnel section of approximately 9 km long between the La Praz caverns and the Modane safety site (digging using conventional methods and/or tunnel boring machine) as well as the related intertube galleries and service/utility rooms,
— additional civil engineering works on the tube running between the La Praz safety site and the Operational Worksite 7 (waterproofing and surfacing/paving).
For operational worksite 7 (CO7):
— construction of the Saint-Martin-la-Porte platform (fence, earthworks, dikes, power supply, site ventilation, pit water treatment, other site facilities),
— civil engineering works at the foot of the Saint-Martin-la-Porte decline for construction of the second tube, including the tunnel boring machine assembly cavern as well as the related intertube galleries and service/utility rooms,
— civil engineering works on the second tube of the base tunnel of approximately 8 km long between the foot of the Saint-Martin-la-Porte decline and the foot of the La Praz decline (digging using conventional methods and/or tunnel boring machine) as well as the related intertube galleries and service/utility rooms,
— civil engineering works on the second tube of the base tunnel of approximately 8 km long between the foot of the Saint-Martin-la-Porte decline and the foot of the La Praz decline (digging using conventional methods and/or tunnel boring machine) as well as the related intertube galleries and service/utility rooms,
— additional civil engineering works on the existing tube running between…
… Saint-Martin-la-Porte and La Praz (surfacing/paving, drainage, clean-up, laying of grouted-aggregate concrete),
… the 2 branches of the Saint-Martin-la-Porte decline (reboring where needed, supports, waterproofing and surfacing/paving), partly going through productive coal strata,
— civil works on the base tunnel (digging using conventional methods) towards Saint-Julien-Montdenis up to the junction with the adjacent work item.
For operational worksites 6 and 7 (CO6/7):
— construction of all facilities needed to provide logistics and back-up (temporary and/or permanent facilities, underground works, utilities, etc.),
— construction of sites for the pre-sorting of excavated materials for future reuse, as well as temporary and permanent disposal sites for materials deriving from earthworks and underground excavation,
— transfer of excavation materials to temporary or permanent disposal sites.
The scope of this “CO 6/7" lot may undergo limited changes in relation to the perimeters of “Operational Worksite 5” to the east and “Operational Worksite 8” to the west, based on the actual progress of each of the projects and the need to keep the project implementation programme within the expected timeframes.
The scope of this “CO 6/7" lot may undergo limited changes in relation to the perimeters of “Operational Worksite 5” to the east and “Operational Worksite 8” to the west, based on the actual progress of each of the projects and the need to keep the project implementation programme within the expected timeframes.
Valeur estimée hors TVA: 1 130 000 000 EUR 💰
Durée de l'accord: 98 mois
Nom du projet ou programme financé par l’UE: TENT-T (Trans-European Transport Network): project No. 2014-EU-TM-0401-M
Informations complémentaires:
The framework contract on this lot n. 2 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. is not contractually binding. It is merely a rough guide calculated on a base tunnel section length of approximately 23,1 km.
The framework contract on this lot n. 2 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. is not contractually binding. It is merely a rough guide calculated on a base tunnel section length of approximately 23,1 km.
Intitulé du lot: Operational Worksite 8: Construction of the Tunnel from the Villard-Clément Gates
Numéro du lot: 3
Brève description:
The activities of this lot n. 3 include the transfer of existing facilities (especially the cut-and-cover tunnel of Saint-Julien-Mont-Denis and related facilities) and construction of all future base tunnel facilities over a distance of roughly 1,8 to 4 km in the immediate vicinity of Villard-Clément.
The activities of this lot n. 3 include the transfer of existing facilities (especially the cut-and-cover tunnel of Saint-Julien-Mont-Denis and related facilities) and construction of all future base tunnel facilities over a distance of roughly 1,8 to 4 km in the immediate vicinity of Villard-Clément.
— construction of the Villard-Clément worksite platform (fence, earthworks, dikes, power supply, site ventilation, pit water treatment, other site facilities),
— temporary supports needed for earthworks to construct the attack point of the base tunnel,
— earthworks needed to construct the attack point of the base tunnel and the cut-and-cover tunnel linked with the one already completed,
— civil engineering works on the 2 tubes of the base tunnel over a distance of 1,8 km to 4 km (digging, supports, waterproofing and surfacing/paving), as well as the related intertube galleries and service/utility rooms,
— civil engineering works on the cut-and-cover tunnel linked with the one already constructed under Operational Worksite 9a and the base tunnel entrance, over roughly 150 m, plus the permanent back filling on the facility itself,
— construction of all facilities needed to provide logistics and back-up (temporary and/or permanent facilities, underground works, utilities, etc...),
— construction of sites for the pre-sorting of excavated materials for future reuse and temporary disposal,
The scope of this “Operational Worksite 8” lot may undergo limited changes within the perimeters of “Operational Worksite 7” to the east, based on the actual progress of each of the worksites and the need to keep the project implementation programme within the expected timeframes.
The scope of this “Operational Worksite 8” lot may undergo limited changes within the perimeters of “Operational Worksite 7” to the east, based on the actual progress of each of the worksites and the need to keep the project implementation programme within the expected timeframes.
The framework contract on this lot n. 3 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. is not contractually binding. It is merely a rough guide calculated on a base tunnel section length of approximately 4 km.
The framework contract on this lot n. 3 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. is not contractually binding. It is merely a rough guide calculated on a base tunnel section length of approximately 4 km.
Lieu d'exécution
Site principal ou lieu d'exécution:
Villarodin-Bourget/Modane
La Praz/Saint-Martin-la-Porte.
Saint-Julien-Montdenis.
Informations juridiques, économiques, financières et techniques Conditions de participation
Habilitation à exercer l'activité professionnelle:
Each economic operator, acting alone or in a consortium must present:
— either forms DC1 and DC2 or their equivalents, freely available at the following address: http://www.economie.gouv.fr/daj/formulaires-declaration-du-candidat (in case of consortium/venture, the DC1 form must be provided only by the consortium/venture representative),
— either forms DC1 and DC2 or their equivalents, freely available at the following address: http://www.economie.gouv.fr/daj/formulaires-declaration-du-candidat (in case of consortium/venture, the DC1 form must be provided only by the consortium/venture representative),
— or the European Single Procurement Document (ESPD), or their equivalents for bidders that are not based in European Union; it must be understood in that TELT does not authorise candidates to mention in the European Single Procurement Document or the equivalent that they are equipped with the required skills and capabilities without providing specific details on same.
— or the European Single Procurement Document (ESPD), or their equivalents for bidders that are not based in European Union; it must be understood in that TELT does not authorise candidates to mention in the European Single Procurement Document or the equivalent that they are equipped with the required skills and capabilities without providing specific details on same.
Economic operators subject to the italian law will also have to provide the following documents:
— the social security contributions payment certificate (DURC),
— the “protocollo operativo per il Monitoraggio finanziario delle Grandi Opere (MGO)” filled form, avilable at the following address: http://www.telt-sas.com/it/fornitori/.
Situation économique et financière:
Each economic operator, acting alone or in a consortium/venture, must prove that it has the required economic, asset and financial capabilities by presenting the following:
— certified financial statements (including income statement) available for the financial years 2015, 2016 and 2017 (or equivalent for non-french candidates),
— a filled copy of the Excel file “bilans financiers” (financial statements) available at the following address: https://telt.achatpublic.com/accueil/,
— an insurance certificate for occupational risks specifying the guaranteed capital value.
Niveau(x) minimal/minimaux de normes:
The minimum annual turnover required of candidates for each of the 3 years 2015, 2016 and 2017 (for consortiums/ventures, this should be understood as the cumulative turnover of all member companies and, eventually, that of the contractors involved alongside the candidate whatever their legal ties) is:
The minimum annual turnover required of candidates for each of the 3 years 2015, 2016 and 2017 (for consortiums/ventures, this should be understood as the cumulative turnover of all member companies and, eventually, that of the contractors involved alongside the candidate whatever their legal ties) is:
— 220 000 000 EUR excl. taxes for lot n. 1 (operational worksite 5),
— 220 000 000 EUR excl. taxes for lot n. 2 (operational worksite 6/7),
— 30 000 000 EUR excl. taxes for lot n. 3 (operational worksite 8).
The turnover corresponds to the turnover available according to accessible data, based on the foundation date of the company or on the starting date of activities for an economic operator. If the candidate is unable to provide the turnover required, it will be allowed to prove its financial capacities via any other document recognised as an equivalent.
The turnover corresponds to the turnover available according to accessible data, based on the foundation date of the company or on the starting date of activities for an economic operator. If the candidate is unable to provide the turnover required, it will be allowed to prove its financial capacities via any other document recognised as an equivalent.
Capacité technique et professionnelle:
Each economic operator, acting alone or as a consortium/venture, must demonstrate it has sufficient technical and professional capabilities by providing:
1) Human and material resources:
— a declaration of its annual average staff headcount and the size of its managerial staff for the last 3 years,
— a description of the tools and equipment it shall use to execute this framework contract.
2) Professional references:
— a list of projects it has executed over the last 10 years.
3) Quality certifications:
— its quality certificates (e.g. ISO 9001, 14001, 18001 or equivalents).
Niveau(x) minimal/minimaux de normes:
Concerning professional references, the candidate must provide at least a current reference or obtained within the last ten years for each of the following components of the following work items (in case of consortiums/ventures, one reference per consortium is sufficient):
Concerning professional references, the candidate must provide at least a current reference or obtained within the last ten years for each of the following components of the following work items (in case of consortiums/ventures, one reference per consortium is sufficient):
Lot n. 1 (operational worksite 5) and Lot n. 2 (operational worksite 6/7):
— tunnel with an excavated section of at least 60 m
— cavern with a section of more than 250 m
— mechanised excavation on a length of more than 5 km,
— project with excavation and concurrent surfacing/paving from several attack fronts,
— management of material stocks of more than 200 000 m
Lot n. 3 (operational worksite 8):
— tunnel dug using conventional methods on a length of at least 500 m and with a section of at least 60 m
— tunnel dug using conventional methods through rocky terrains with a section of at least 60 m
— tunnel dug using conventional methods through loose terrain with a section of at least 60 m
— cut-and-cover civil engineering works on a length of at least 50 m with an interior section of at least 40 m
— support structure with a height of more than 10 m,
— earthworks with a volume of more than 100 000 m
— earthworks in the presence of water with treatment of seepage (such as water plugs, soil injection or pumping).
Candidates are not allowed to provide more than 5 references per item. Should they provide more than 5 references, only the first 5 consulted will be considered.
Each reference must be written using the table available on TELT’s dematerialisation platform (http://telt.achatpublic.com/accueil/). This table containing the candidate's role, turnover share and scope of technical services of each economic operator concerned, as well as the specific addresses of the clients concerned, should be provided with certificates of satisfactory performance, if possible.
Each reference must be written using the table available on TELT’s dematerialisation platform (http://telt.achatpublic.com/accueil/). This table containing the candidate's role, turnover share and scope of technical services of each economic operator concerned, as well as the specific addresses of the clients concerned, should be provided with certificates of satisfactory performance, if possible.
If the candidate is unable to provide the proof of technical and professional abilities required, it will be allowed to prove them via any other document recognised as an equivalent.
Liste et brève description des règles et critères:
Candidates will be selected on the basis of their economic, financial, technical and professional abilities, according to the documents provided with their bids, and after the exclusion of all candidatures judged inadmissible.
Exécution du marché
Dépôts et garanties exigés:
A contract holdback of 5 % of the value of the service shall be applied to each purchase order and follow-on contract. This holdback may be replaced at the holder's discretion with a first-demand guarantee. The holder shall not replace it with a joint and personal guarantee.
A contract holdback of 5 % of the value of the service shall be applied to each purchase order and follow-on contract. This holdback may be replaced at the holder's discretion with a first-demand guarantee. The holder shall not replace it with a joint and personal guarantee.
Principales conditions de financement et modalités de paiement et/ou référence aux dispositions pertinentes qui les régissent:
This framework contract is financed by the European Union, Italy and France.
Payments for services shall be made by bank transfer within 45 days effective from the date of receipt of the related invoice. Each purchase order shall be based on unit prices that will be adjusted, each follow-on contract shall be based on lump sums or unit prices that may be adjusted or not.
Principales conditions de financement et modalités de paiement et/ou référence aux dispositions pertinentes qui les régissent
Payments for services shall be made by bank transfer within 45 days effective from the date of receipt of the related invoice. Each purchase order shall be based on unit prices that will be adjusted, each follow-on contract shall be based on lump sums or unit prices that may be adjusted or not.
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché:
Candidates may bid as individual companies or as consortiums/ventures. For each lot, the same legal person shall neither combine both approaches nor represent several consortiums/ventures. Once the contract is awarded, the form of consortium/venture required by TELT shall be the mixed form with a jointly-liable representative. The mixed form is justified by the diversity of the skills requested and the missions required, both of which are highly specialised. Each of the co-contractors must therefore be committed solely to the component of the contract where it is engaged. As to the representative's joint liability, it allows for the satisfactory performance of the whole service to be guaranteed and for remedial measures to be proposed to the project owner, should any co-contractor default on its obligation.
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché
Candidates may bid as individual companies or as consortiums/ventures. For each lot, the same legal person shall neither combine both approaches nor represent several consortiums/ventures. Once the contract is awarded, the form of consortium/venture required by TELT shall be the mixed form with a jointly-liable representative. The mixed form is justified by the diversity of the skills requested and the missions required, both of which are highly specialised. Each of the co-contractors must therefore be committed solely to the component of the contract where it is engaged. As to the representative's joint liability, it allows for the satisfactory performance of the whole service to be guaranteed and for remedial measures to be proposed to the project owner, should any co-contractor default on its obligation.
Conditions d'exécution du contrat:
Authorisations from the administration relative to site facilities, utilities, transportation, execution of works 24/7, employment of workers, use of explosives shall be required. The contract holder shall take all steps necessary to obtain these documents from all competent authorities.
Authorisations from the administration relative to site facilities, utilities, transportation, execution of works 24/7, employment of workers, use of explosives shall be required. The contract holder shall take all steps necessary to obtain these documents from all competent authorities.
This framework contract will also contain an employment promotion clause aimed at facilitating the professional integration of disadvantaged persons (number of working hours required from integrated persons).
Procédure
Base juridique: 32014L0025
Justification de l’accord-cadre:
For each lot, the framework contract period is above 8 years because, in addition to the effective work time, it also includes the underground work preparation timeframe, the eventual hazards deriving from the variable nature of the subsoils encountered during digging, as well as timeframes for work acceptance and guarantee period.
For each lot, the framework contract period is above 8 years because, in addition to the effective work time, it also includes the underground work preparation timeframe, the eventual hazards deriving from the variable nature of the subsoils encountered during digging, as well as timeframes for work acceptance and guarantee period.
Justification d'une durée d'accord-cadre supérieure à quatre ans:
For each lot, the framework contract period is above 8 years because, in addition to the effective work time, it also includes the underground work preparation timeframe, the eventual hazards deriving from the variable nature of the subsoils encountered during digging, as well as timeframes for work acceptance and guarantee period.
Justification d'une durée d'accord-cadre supérieure à quatre ans
For each lot, the framework contract period is above 8 years because, in addition to the effective work time, it also includes the underground work preparation timeframe, the eventual hazards deriving from the variable nature of the subsoils encountered during digging, as well as timeframes for work acceptance and guarantee period.
Heure limite de réception des offres: 14:00
Langues dans lesquelles les offres ou les demandes de participation peuvent être présentées: français 🗣️
The award restrictions mentioned in II.1.6 above apply also in the case of consortiums/ventures with different consortium/venture representative, but comprised of the same members.
The duration mentioned in II.2.7 is the period of time during which the purchase orders and follow-on contracts should be produced. The tentative duration for the execution of works (outside the preparation and warranty periods) is of 72 months for lot 1, 68 months for lot 2, and 68 months for lot 3.
The duration mentioned in II.2.7 is the period of time during which the purchase orders and follow-on contracts should be produced. The tentative duration for the execution of works (outside the preparation and warranty periods) is of 72 months for lot 1, 68 months for lot 2, and 68 months for lot 3.
It is specified that the reference language for the adjudication of this public contract is French. Any translation of this call for tenders in Italian or English is to be considered a courtesy translation.
Except for the Excel file and the reference table mentioned in III.1.2 and III.1.3 above respectively, there is no procurement documents available to the candidates. Interested candidates will only have to provide, before the deadline mentioned in IV.2.2 above, a candidate dossier including all the documents and information described above. Candidates will have to submit their bid uniquely via the dematerialisation platform, at the following address: http://telt.achatpublic.com/accueil/. Each transmission will be associated to a certified receipt date and it will produce an electronic return receipt. The application dossier may include a backup copy, delivered by hand against receipt or sent by express mail with acknowledgement of receipt to the address provided in I.1. All bids, including all backup copies, which are delivered after the date and hour specified will be declared as beyond the deadline and rejected. It is up to the candidates to verify and make sure that their dossier has arrived before the deadline.
Except for the Excel file and the reference table mentioned in III.1.2 and III.1.3 above respectively, there is no procurement documents available to the candidates. Interested candidates will only have to provide, before the deadline mentioned in IV.2.2 above, a candidate dossier including all the documents and information described above. Candidates will have to submit their bid uniquely via the dematerialisation platform, at the following address: http://telt.achatpublic.com/accueil/. Each transmission will be associated to a certified receipt date and it will produce an electronic return receipt. The application dossier may include a backup copy, delivered by hand against receipt or sent by express mail with acknowledgement of receipt to the address provided in I.1. All bids, including all backup copies, which are delivered after the date and hour specified will be declared as beyond the deadline and rejected. It is up to the candidates to verify and make sure that their dossier has arrived before the deadline.
Selected candidates shall receive a tender file whereby they shall be invited to submit their bids within a specified timeframe. Thereafter, the successful tenderer of each lot shall be chosen after negotiation, where necessary. It is hereby understood that, pursuant to article R.2161-23 of the Public Procurement Code (former article 74 of Decree n. 2016-360 on public procurement), TELT reserves the right to gradually restrict the number of bidders allowed to negotiate as the negotiation phases unfold.
Selected candidates shall receive a tender file whereby they shall be invited to submit their bids within a specified timeframe. Thereafter, the successful tenderer of each lot shall be chosen after negotiation, where necessary. It is hereby understood that, pursuant to article R.2161-23 of the Public Procurement Code (former article 74 of Decree n. 2016-360 on public procurement), TELT reserves the right to gradually restrict the number of bidders allowed to negotiate as the negotiation phases unfold.
This contract is subject to:
— Italian law n. 191/2009 on construction work items with regard to procedures for financing of the project by the Italian State; these rules will conform to European Union laws and regulations,
— the rules on the fight against Mafia infiltrations agreed by the French and Italian governments and brought into force via the Contract Regulation approved by the CIG (Intergovernmental Commission) and published as part of Decree n. 2017-432 of 5.4.2017 and in force since 9 April 2018, in its consolidated version.
— the rules on the fight against Mafia infiltrations agreed by the French and Italian governments and brought into force via the Contract Regulation approved by the CIG (Intergovernmental Commission) and published as part of Decree n. 2017-432 of 5.4.2017 and in force since 9 April 2018, in its consolidated version.
In accordance with article R.2185-1 of the Public Procurement Code (former article 98 of Decree n. 2016-360), candidates and bidders are reminded that the tender can be withdrawn, at any moment of the procedure, up until the signing of the contract. In this case, bidders do not have any right to sign the contract, or to be reimbursed for the expenses they incurred as part of their application. The tender can be withdrawn by the Contracting Entity because of economic, legal, or technical reasons, or following a decision of the 2 States.
In accordance with article R.2185-1 of the Public Procurement Code (former article 98 of Decree n. 2016-360), candidates and bidders are reminded that the tender can be withdrawn, at any moment of the procedure, up until the signing of the contract. In this case, bidders do not have any right to sign the contract, or to be reimbursed for the expenses they incurred as part of their application. The tender can be withdrawn by the Contracting Entity because of economic, legal, or technical reasons, or following a decision of the 2 States.
Finally, the successful tenderer of each lot of this public tender agrees to respect TELT’s code of ethics (freely downloadable from the following address: http://www.telt-sas.com/fr/statut-code-ethique-accords), and also ensure that it is observed by its employees, co-contractors and subcontractors.
Finally, the successful tenderer of each lot of this public tender agrees to respect TELT’s code of ethics (freely downloadable from the following address: http://www.telt-sas.com/fr/statut-code-ethique-accords), and also ensure that it is observed by its employees, co-contractors and subcontractors.
Informations complémentaires Organe de révision
Nom: Tribunal Administratif de Grenoble
Adresse postale: BP 1135
Commune postale: Grenoble
Code postal: 38022
Pays: France 🇫🇷
Téléphone: +33 476420000📞
Courrier électronique: greffe.ta-grenoble@juradm.fr📧
Fax: +33 476422269 📠
Adresse Internet: http://grenoble.tribunal-administratif.fr🌏
Informations sur les délais d'introduction des recours:
Applicable appeal procedures are:
— the pre-contractual interlocutory procedure (article L.551-5 of the french Administrative Justice Code), which can be started before the signing of the public works contract,
— the contractual interlocutory procedure (article L.551-13 of the french Administrative Justice Code), which can be started within 31 days from the publication of an award notice on the OJEU or within 6 months from the day after the conclusion of the public tender if no award notice is published,
Informations sur les délais d'introduction des recours
— the contractual interlocutory procedure (article L.551-13 of the french Administrative Justice Code), which can be started within 31 days from the publication of an award notice on the OJEU or within 6 months from the day after the conclusion of the public tender if no award notice is published,
— an appeal contesting the validity of the contract or of some of its advertising clauses in front of a litigation judge, which can be lodged within 2 months following all adequate advertising measures.
Service auprès duquel des informations sur la procédure de recours peuvent être obtenues
Nom: Tribunal administratif de Grenoble
Source: OJS 2019/S 053-123099 (2019-03-12)
Informations complémentaires (2019-03-25) Objet Métadonnées de l'avis
Type de document: Informations complémentaires
Pouvoir adjudicateur Identité
Adresse postale: Savoie Technolac - Bâtiment Homère - 13 allée du Lac de Constance - CS 90281
Commune postale: Le Bourget du Lac
Référence Dates
Date d'envoi: 2019-03-25 📅
Date de publication: 2019-03-29 📅
Identifiants
Numéro d'avis: 2019/S 063-147718
Se réfère à l'avis: 2019/S 053-123099
Numéro JO-S: 63
Informations complémentaires
The Contract Notice, published in English, to which this corrigendum notice refers, is just a courtesy translation of the contract notice published in French in the Official Journal of the European Union on 15.3.2019 with reference number 2019/S 053-123101. Since the award procedure of this public contract follows French law, the French language version of the Contract Notice is the only one which shall be taken into consideration if there is a difference between these Contract Notices.
The Contract Notice, published in English, to which this corrigendum notice refers, is just a courtesy translation of the contract notice published in French in the Official Journal of the European Union on 15.3.2019 with reference number 2019/S 053-123101. Since the award procedure of this public contract follows French law, the French language version of the Contract Notice is the only one which shall be taken into consideration if there is a difference between these Contract Notices.
Source: OJS 2019/S 063-147718 (2019-03-25)
Avis d'attribution de marché (2021-10-07) Objet Champ d'application du marché
Valeur totale du marché: 1609276225.34 EUR 💰
Métadonnées de l'avis
Type de document: Avis d'attribution de marché
Procédure
Type de soumission: Sans objet
Pouvoir adjudicateur Identité
Adresse postale: Savoie Technolac - Bâtiment Homère - 13 allée du Lac de Constance - BP 281
Référence Dates
Date d'envoi: 2021-10-07 📅
Date de publication: 2021-10-12 📅
Identifiants
Numéro d'avis: 2021/S 198-517556
Numéro JO-S: 198
Informations complémentaires
The framework contract of this lot n. 1 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. above is not contractually binding. This is merely a rough guide calculated on a base tunnel section length of approximately 21.9 km.
Each purchase order or follow-on contract shall contain a contractual period of execution.
The framework contract of this lot n. 1 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. above is not contractually binding. This is merely a rough guide calculated on a base tunnel section length of approximately 21.9 km.
Each purchase order or follow-on contract shall contain a contractual period of execution.
Objet Champ d'application du marché
Intitulé du lot: Operational Worksite 5 : Construction of the tunnel from the Villarodin-Bourget/Modane decline
Brève description:
The works to be carried out by means of purchase orders may especially include :
- construction of the Villarodin-Bourget platform (fence, earthworks, dikes, power supply, site ventilation, pit water treatment, other site facilities);
- civil engineering works on the Modane safety site and the related service galleries (digging using conventional methods, supports, waterproofing and surfacing/paving) from the foot of the Villarodin-Bourget/Modane decline;
- civil engineering works on the base tunnel (digging using conventional methods and/or tunnel boring machine, supports, waterproofing and surfacing/paving) as well as the related intertube galleries and service/utility rooms;
- civil engineering works to reconstruct the Villarodin-Bourget/Modane decline in its final dimensions;
- construction of all facilities needed to provide site logistics and backup (temporary or permanent facilities, underground works, utilities, etc...);
- construction of sites for preclassification of excavated materials for subsequent reuse and of sites for the temporary or permanent storage of materials deriving from underground earthworks and excavations (Moulin and Tierces sites);
- the stocking and transportation of excavated materials via conveyor belt.
Works to be carried out through follow-on contracts (initiated or not depending on the operational date of the lot in charge of testing, sorting and reusing the excavation materials) involve the management and use of excavation materials, which may include all or some of the following services :
Works to be carried out through follow-on contracts (initiated or not depending on the operational date of the lot in charge of testing, sorting and reusing the excavation materials) involve the management and use of excavation materials, which may include all or some of the following services :
- testing, sorting and final classification of excavation materials;
- transfer of excavation materials to temporary or permanent disposal sites;
- earthworks to allow for permanent storage on the Tierces site.
The scope of this "Operational Worksite 5" lot may undergo limited changes in relation to the perimeters of "Operational Worksite 4" to the east and "Operational Worksite 6" to the west, based on the actual progress of each of the worksites and the need to keep the project implementation programme within the expected timeframes.
The scope of this "Operational Worksite 5" lot may undergo limited changes in relation to the perimeters of "Operational Worksite 4" to the east and "Operational Worksite 6" to the west, based on the actual progress of each of the worksites and the need to keep the project implementation programme within the expected timeframes.
Nom du projet ou programme financé par l’UE: TENT-T (Trans-European Transport Network) : project n. 2014-EU-TM-0401-M
Informations complémentaires:
The framework contract of this lot n. 1 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. above is not contractually binding. This is merely a rough guide calculated on a base tunnel section length of approximately 21.9 km.
The framework contract of this lot n. 1 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. above is not contractually binding. This is merely a rough guide calculated on a base tunnel section length of approximately 21.9 km.
Intitulé du lot: Operational worksite 6/7 : Construction of the tunnel from the La Praz and Saint-Martin-la-Porte declines
Brève description:
The activities of this lot n. 2 include the transfer of existing facilities (especially declines) and the construction of all future base tunnel facilities over a distance of roughly 23.1 km, running from Saint-Martin-la-Porte up to Modane.
For operational worksite 6 (CO6) :
- construction of the La Praz platform (fence, earthworks, dikes, power supply, site ventilation, pit water treatment, other site facilities);
- civil engineering works on the La Praz safety site and the related service galleries (digging using conventional methods) from the foot of the La Praz decline;
- civil engineering works on the base tunnel section of approximately 9 km long between the La Praz caverns and the Modane safety site (digging using conventional methods and/or tunnel boring machine) as well as the related intertube galleries and service/utility rooms;
- civil engineering works on the base tunnel section of approximately 9 km long between the La Praz caverns and the Modane safety site (digging using conventional methods and/or tunnel boring machine) as well as the related intertube galleries and service/utility rooms;
- additional civil engineering works on the tube running between the La Praz safety site and the Operational Worksite 7 (waterproofing and surfacing/paving).
For operational worksite 7 (CO7) :
- construction of the Saint-Martin-la-Porte platform (fence, earthworks, dikes, power supply, site ventilation, pit water treatment, other site facilities);
- civil engineering works at the foot of the Saint-Martin-la-Porte decline for construction of the second tube, including the tunnel boring machine assembly cavern as well as the related intertube galleries and service/utility rooms;
- civil engineering works on the second tube of the base tunnel of approximately 8 km long between the foot of the Saint-Martin-la-Porte decline and the foot of the La Praz decline (digging using conventional methods and/or tunnel boring machine) as well as the related intertube galleries and service/utility rooms;
- civil engineering works on the second tube of the base tunnel of approximately 8 km long between the foot of the Saint-Martin-la-Porte decline and the foot of the La Praz decline (digging using conventional methods and/or tunnel boring machine) as well as the related intertube galleries and service/utility rooms;
- additional civil engineering works on the existing tube running between…
… Saint-Martin-la-Porte and La Praz (surfacing/paving, drainage, clean-up, laying of grouted-aggregate concrete);
… the two branches of the Saint-Martin-la-Porte decline (reboring where needed, supports, waterproofing and surfacing/paving), partly going through productive coal strata;
- civil works on the base tunnel (digging using conventional methods) towards Saint-Julien-Montdenis up to the junction with the adjacent work item.
For operational worksites 6 and 7 (CO6/7) :
- construction of all facilities needed to provide logistics and back-up (temporary and/or permanent facilities, underground works, utilities, etc.);
- construction of sites for the pre-sorting of excavated materials for future reuse, as well as temporary and permanent disposal sites for materials deriving from earthworks and underground excavation.
- transfer of excavation materials to temporary or permanent disposal sites.
The scope of this "CO 6/7" lot may undergo limited changes in relation to the perimeters of "Operational Worksite 5" to the east and "Operational Worksite 8" to the west, based on the actual progress of each of the projects and the need to keep the project implementation programme within the expected timeframes
The scope of this "CO 6/7" lot may undergo limited changes in relation to the perimeters of "Operational Worksite 5" to the east and "Operational Worksite 8" to the west, based on the actual progress of each of the projects and the need to keep the project implementation programme within the expected timeframes
Nom du projet ou programme financé par l’UE: TENT-T (Trans-European Transport Network) : project No. 2014-EU-TM-0401-M
Informations complémentaires:
The framework contract on this lot n. 2 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. is not contractually binding. It is merely a rough guide calculated on a base tunnel section length of approximately 23.1 km.
The framework contract on this lot n. 2 shall be concluded without any minimum or maximum amount. The estimated amount mentioned in II.2.6. is not contractually binding. It is merely a rough guide calculated on a base tunnel section length of approximately 23.1 km.
Intitulé du lot: Operational worksite 8 : Construction of the tunnel from the Villard-Clément gates
Brève description:
The activities of this lot n. 3 include the transfer of existing facilities (especially the cut-and-cover tunnel of Saint-Julien-Montdenis and related facilities) and construction of all future base tunnel facilities over a distance of roughly 1.8 to 4 km in the immediate vicinity of Villard-Clément.
The activities of this lot n. 3 include the transfer of existing facilities (especially the cut-and-cover tunnel of Saint-Julien-Montdenis and related facilities) and construction of all future base tunnel facilities over a distance of roughly 1.8 to 4 km in the immediate vicinity of Villard-Clément.
- construction of the Villard-Clément worksite platform (fence, earthworks, dikes, power supply, site ventilation, pit water treatment, other site facilities);
- temporary supports needed for earthworks to construct the attack point of the base tunnel;
- earthworks needed to construct the attack point of the base tunnel and the cut-and-cover tunnel linked with the one already completed.
- civil engineering works on the two tubes of the base tunnel over a distance of 1.8 to 4 km (digging, supports, waterproofing and surfacing/paving), as well as the related intertube galleries and service/utility rooms;
- civil engineering works on the cut-and-cover tunnel linked with the one already constructed under Operational Worksite 9a and the base tunnel entrance, over roughly 150 m, plus the permanent backfilling on the facility itself;
- construction of all facilities needed to provide logistics and back-up (temporary and/or permanent facilities, underground works, utilities, etc...);
- construction of sites for the pre-sorting of excavated materials for future reuse and temporary disposal;
The scope of this "Operational Worksite 8" lot may undergo limited changes within the perimeters of "Operational Worksite 7" to the east, based on the actual progress of each of the worksites and the need to keep the project implementation programme within the expected timeframes.
The scope of this "Operational Worksite 8" lot may undergo limited changes within the perimeters of "Operational Worksite 7" to the east, based on the actual progress of each of the worksites and the need to keep the project implementation programme within the expected timeframes.
Informations complémentaires:
Each purchase order or follow-on contract shall contain a contractual period of execution
Lieu d'exécution
Site principal ou lieu d'exécution:
Villarodin-Bourget / Modane
La Praz / Saint-Martin-la-Porte
Saint-Julien-Montdenis
Procédure Critères d'attribution
Critère de qualité (nom): Technical merit
Critère de qualité (pondération): 45
Prix (pondération): 55
Attribution du marché
Date de conclusion du contrat: 2021-09-09 📅
Nom: Eiffage Génie Civil
Adresse postale: 3-7 place de l'Europe
Commune postale: Vélizy-Villacoublay
Code postal: 78140
Pays: France 🇫🇷 Yvelines
🏙️
Nom: Spie Batignolles
Adresse postale: 30 avenue du Général Gallieni
Commune postale: Nanterre
Code postal: 92023
Pays: Hauts-de-Seine
🏙️
Nom: Ghella
Adresse postale: Via Pietro Borsieri 2/A
Commune postale: Roma
Code postal: 00195
Pays: Italie 🇮🇹
Roma
🏙️
Nom: Cogeis
Adresse postale: Via XXV Aprile 2/15
Commune postale: Quincinetto
Code postal: 10010
Pays: Torino
🏙️
Valeur totale du marché: 1609276225.34 EUR 💰
Nom: Vinci Construction Grands Projets
Adresse postale: 5 cours Ferdinand de Lesseps
Commune postale: Rueil-Malmaison
Code postal: 92851
Nom: Dodin Campenon Bernard
Adresse postale: 20 chemin de la Flambère
Commune postale: Toulouse
Code postal: 31000
Pays: Haute-Garonne
🏙️
Nom: Vinci Construction France TP Lyon
Adresse postale: 34 rue Antoine Primat
Commune postale: Villeurbanne
Code postal: 69603
Pays: Rhône
🏙️
Nom: WeBuild
Adresse postale: Via dei Missaglia 97
Commune postale: Milano
Code postal: 20142
Pays: Milano
🏙️
Valeur totale du marché: 1660661682.94 EUR 💰
Nom: Implenia Suisse
Adresse postale: 24 Industriestrasse
Commune postale: Dietlikon
Code postal: 8305
Pays: Suisse 🇨🇭
Zürich
🏙️
Nom: Implenia France
Adresse postale: 237 avenue Marie Curie
Commune postale: Archamps
Code postal: 74160
Pays: Haute-Savoie
🏙️
Nom: Nge
Adresse postale: Parc d'Activités de Laurade
Commune postale: Tarascon
Code postal: 13156
Pays: Bouches-du-Rhône
🏙️
Nom: Itinera
Adresse postale: Via Mario Balustra 15
Commune postale: Tortona
Code postal: 15057
Pays: Alessandria
🏙️
Nom: Rizzani de Echer
Adresse postale: Via Buttrio 36
Commune postale: Pozzuolo del Friuli
Code postal: 33050
Pays: Udine
🏙️
Valeur totale du marché: 304 827 071 EUR 💰
Informations sur les appels d'offres
Nombre d'offres reçues: 4
5
7
Référence Informations complémentaires
This contract is subject to :
-italian law n. 191/2009 on construction work items with regard to procedures for financing of the project by the Italian State; these rules will conform to European Union laws and regulations,
- the rules on the fight against Mafia infiltrations agreed by the French and Italian governments and brought into force via the Contract Regulation approved by the CIG (Intergovernmental Commission) and published as part of Decree n. 2017-432 of 5 April 2017 and in force since 9 April 2018, in its consolidated version.
- the rules on the fight against Mafia infiltrations agreed by the French and Italian governments and brought into force via the Contract Regulation approved by the CIG (Intergovernmental Commission) and published as part of Decree n. 2017-432 of 5 April 2017 and in force since 9 April 2018, in its consolidated version.
In accordance with article R.2185-1 of the Public Procurement Code (former article 98 of Decree n. 2016-360), candidates and bidders are reminded that the tender can be withdrawn, at any moment of the procedure, up until the signing of the contract. In this case, bidders do not have any right to sign the contract, or to be reimbursed for the expenses they incurred as part of their application. The tender can be withdrawn by the Contracting Entity because of economic, legal, or technical reasons, or following a decision of the two States.
In accordance with article R.2185-1 of the Public Procurement Code (former article 98 of Decree n. 2016-360), candidates and bidders are reminded that the tender can be withdrawn, at any moment of the procedure, up until the signing of the contract. In this case, bidders do not have any right to sign the contract, or to be reimbursed for the expenses they incurred as part of their application. The tender can be withdrawn by the Contracting Entity because of economic, legal, or technical reasons, or following a decision of the two States.
Informations complémentaires Organe de révision
Informations sur les délais d'introduction des recours:
Applicable appeal procedures are :
- the pre-contractual interlocutory procedure (article L.551-5 of the french Administrative Justice Code), which can be started before the signing of the public works contract;
- the contractual interlocutory procedure (article L.551-13 of the french Administrative Justice Code), which can be started within 31 days from the publication of an award notice on the OJEU or within 6 months from the day after the conclusion of the public tender if no award notice is published;
Informations sur les délais d'introduction des recours
- the contractual interlocutory procedure (article L.551-13 of the french Administrative Justice Code), which can be started within 31 days from the publication of an award notice on the OJEU or within 6 months from the day after the conclusion of the public tender if no award notice is published;
- an appeal contesting the validity of the contract or of some of its advertising clauses in front of a litigation judge, which can be lodged within two months following all adequate advertising measures.