Duration of validity of the tender is one hundred and ninety (190) days from the deadline for submission of tender
The tenderer must also provide proof that each of the associated independent contractors or companies will put all necessary means at the tenderer’s disposal during the execution of the assignment.
Economic operators can participate in the tendering procedure on their own or in groups.
Tenderer shall submit 1 single tender on its own or as a member of 1 single group.
Tenderers can submit as individual contractors, as joint-and-several liability companies or as joint-liability-only companies or consortiums.
If partners are not jointly and severally responsible for performing the contract, the leader of the consortium shall be jointly and severally responsible for performing the contract.
The files shall be sent by platform
achatpublic.com
For downloading operations, please refer to the technical documentation available at:
—
https://www.achatpublic.com
Tenderers are:
— invited to take account of the vagaries of electronic transmission. They shall ensure that the electronic transmission of their folder is complete and fully completed before the deadline for submission of application,
— authorized to transmit a backup copy either by electronic means (USB stick or CD preferentially) or by paper means. The backup copies must be transmitted in sealed envelopes bearing clearly marked “backup copy - Do not open before the deadline for submission of application” and reach the French Development Agency before the deadline for receipt of the tenders. These backup copies can be hand-delivered against receipt on working days, from Monday to Friday, from 09:00 to 12:00 (Paris time) and from 14:00 to 16:00 (Paris time) at the following address:
French Development Agency.
Mail Office
To the attention of SGN/DCP,
Réf: DCP-2018-108,
5 rue Roland Barthes, 75598 Paris Cedex 12
Here are our recommendations to make a deposit fold on our platform dematerialization:
— check the presence of Java on the workstation (available free of charge on the site java.com-version 7 or 8),
— with an ADSL connection, the company must allow 3 hours or 4 hours for a crease of approximately 300 MB.And 6 hours or more if the fold exceeds 300 Mo (the transmission of a ply depends on the performance of the computer station used, network quality as well as Internet throughput),
— advocate the use of an Ethernet cable to access the Internet and avoid Wifi,
— privilege the location of the files locally and avoid the file server on the internal network of the company,
— the company going through a proxy will have to check with his IT department beforehand if no quota is set upfor the uploading of the files,
— the IT department must also check the setting of the antivirus and firewall on the user station,
— the presence of the IT department during the creation and transmission of the fold is strongly recommended.