2018-12-07INELFE — Biscay Gulf — Electrical Interconnection FR-SP — Cable Link (INELFE — INterconexión ELéctrica Francia-España)
The Biscay Gulf electrical Interconnection consists of the construction of a 2 000 MW link. This link is composed of 2 (two) circuits rated 1 000 MW each for DC operating voltage of 400 kV, comprised of 4 power cables, 4 converter station terminals located close to 400 kV Cubnezais substation (France) and Gatica substation (Spain). The length of the route is estimated to be approx. 375 km long starting in Spanish Pais Vasco region (near Bilbao), with underground cable of about 15 km, a submarine section …
Voir la passation de marché » Fournisseurs mentionnés:NKT HV Cables ABPrysmian Powerlink SRL
2014-10-10Offshore Steel Monopile Foundations (Eolien Maritime France (Subsidiary of EDF EN and DONG Energy))
Lot N°1: Design, Engineering, Procurement, Construction and Installation of approximately 75 Monopiles and associated Transition Pieces as Wind Turbine Generators foundations of the Courseulles Wind Farm,
and/or
Lot N°2: Design, Engineering, Procurement, Construction and Installation of approximately 80 Monopiles and associated Transition Pieces as Wind Turbine Generators foundations of the Saint Nazaire Wind Farm.
Voir la passation de marché »
2012-08-03Réalisation de la station de traitement des eaux résiduaires urbaines de SAINTE-SUZANNE et des réseaux de transfert... (CINOR)
Le présent projet s'inscrit dans l'opération plus globale de création de la nouvelle station d'épuration (Step) de Sainte-Suzanne, située au lieu dit "Trois Frères" sur le territoire de la commune de Sainte-Suzanne, Les travaux concernés par le présent projet sont:
Création de la partie maritime de l'émissaire de rejet et de son diffuseur.
Il s'agit de la relance d'un marché de travaux suite à la résiliation du marché initial pour faute du titulaire.
Voir la passation de marché »