2020-04-27Supply Transportation Installation and O&M of 4 WTGs and of a Generator for a Repowered Windfarm in La Réunion (Société Éolienne de Sainte Rose)
Supply transportation installation and O&M of a windfarm in the city of Sainte Rose located in the tropical island of La Réunion (French Territory).
The windfarm is made of 23 turbines of 275 kW each with 32 m of rotor diameter and a hub height of 60 m with a total power of 6 325 MW. The repowered wind farm should be made of 4 WTG with a maximum of 130 m, 100 m of rotor diameter, 80 m of hub height and a power comprised between 2 and 3.5 MW. The supply and the O&M of a generator is part of the base scope.
Voir la passation de marché »
2016-08-19Fourniture, montage et maintenance de 9 aéro-générateurs (Compagnie Nationale du Rhône)
CNR lance un appel international de candidatures pour le compte de sa filiale «Le parc Éolien des Sources du Mistral» en vue de sélectionner des entreprises susceptibles de produire, livrer, monter et mettre en service 9 éoliennes constituant le parc éolien des sources du mistral. Ce projet purgé de tous recours se situe sur les communes de Sacquenay et Chazeuil dans le département de la Côte-d'Or en région Bourgogne-Franche-Comté.
L'objet du présent avis est de sélectionner des entreprises capables …
Voir la passation de marché »