As part of the french government's third call for tenders (AO3 — Dunkerque) and the expected publication of a government's fourth call for tender (AO4 — Oléron a priori) for the electrical connection of French offshore wind farms, RTE is in charge to build the Offshore Substation (OSS).
As part of the connection project for the Dunkerque offshore wind farm, including the Offshore Substation (OSS), RTE is looking for a contractor to carry out the basic design of the OSS.
Date limite
Le délai de réception des offres était de 2018-03-12.
L'appel d'offres a été publié le 2018-02-16.
Informations complémentaires (2018-02-22) Pouvoir adjudicateur Nom et adresse
Nom: RTE Réseau de Transport d'Electricité
Adresse postale: Coeur Defense Tour B, 100 ésplanade du Général de Gaulle
Commune postale: Paris la Defense Cedex
Code postal: 92932
Pays: France 🇫🇷
Personne de contact: Marine Bolzan
Téléphone: +33 179248023📞
Courrier électronique: marine.bolzan@rte-france.com📧
Région: Ile-de-France🏙️
URL: www.rte-france.com🌏
Adresse du profil d'acheteur: https://rte-france.bravosolution.com🌏
Objet Champ d'application du marché
Titre: Basic design Offshore Substation (OSS) - Offshore wind farm Dunkerque (France)
Produits/services: Services de conception technique📦
Brève description:
“As part of the french government's third call for tenders (AO3 - Dunkerque) and the expected publication of a government's fourth call for tender (AO4 -...”
Brève description
As part of the french government's third call for tenders (AO3 - Dunkerque) and the expected publication of a government's fourth call for tender (AO4 - Oléron a priori) for the electrical connection of French offshore wind farms, RTE is in charge to build the Offshore Substation (OSS).
As part of the connection project for the Dunkerque offshore wind farm, including the Offshore Substation (OSS), RTE is looking for a contractor to carry out the basic design of the OSS.
Informations complémentaires Référence de l'avis original
Numéro de l'avis au JO S: 2018/S 036-079318
Changements Texte à corriger dans l'avis original
Numéro de section: IV.2.2
Ancienne valeur
Date: 2018-03-12 📅
L'heure: 17:00
Nouvelle valeur
Date: 2018-03-15 📅
L'heure: 16:00
Autres informations complémentaires
“In this contract notice, applicants must submit information and documents for a RFI. Selected candidates will then participate at the RFQ, but this will...”
In this contract notice, applicants must submit information and documents for a RFI. Selected candidates will then participate at the RFQ, but this will take place as a second step.
Therefore, no documents from RTE will be upload in this contract notice (Scope of work, project contract and other tender documents...). Only selected candidates will be able to access at these documents on the RFQ.
Afficher plus
Source: OJS 2018/S 038-083952 (2018-02-22)
Avis d'attribution de marché (2018-10-10) Pouvoir adjudicateur Nom et adresse
Adresse postale: Coeur Defense Tour B, 100 Esplanade du Général De Gaulle
Objet Champ d'application du marché
Titre: Basic design Offshore Substation (OSS) — Offshore wind farm Dunkerque (France)
Brève description:
“As part of the french government's third call for tenders (AO3 — Dunkerque) and the expected publication of a government's fourth call for tender (AO4 —...”
Brève description
As part of the french government's third call for tenders (AO3 — Dunkerque) and the expected publication of a government's fourth call for tender (AO4 — Oléron a priori) for the electrical connection of French offshore wind farms, RTE is in charge to build the Offshore Substation (OSS).
As part of the connection project for the Dunkerque offshore wind farm, including the Offshore Substation (OSS), RTE is looking for a contractor to carry out the basic design of the OSS.
1️⃣
Lieu d'exécution: France🏙️
Description du marché:
“The contractor will have to carry out a basic design of the Dunkerque project offshore substation including architectural optimisation and cost...”
Description du marché
The contractor will have to carry out a basic design of the Dunkerque project offshore substation including architectural optimisation and cost assessment.
Expected deliverables are reports, 2D layouts and 3D models including all process equipment (HV, LV) and main functionalities of the topside.
This design will be an input for the purchasing process of the OSS. Main electrical and grid studies are not included in the contractor scope of works.
Afficher plus
Informations complémentaires:
“RTE reserves the right to award directly the contract to most competitive bid without negotiation process.”
Procédure Type de procédure
Procédure négociée avec mise en concurrence préalable
Informations administratives
Publication précédente concernant cette procédure: 2018/S 036-079318
Attribution du marché
1️⃣
Numéro de contrat: 1
Titre: Basic Design Offshore Substation (OSS) — Offshore wind farm Dunkerque (France)
Date de conclusion du contrat: 2018-09-26 📅
Informations complémentaires Organe de révision
Nom: Tribunal de grande instance de Nanterre
Adresse postale: 179-191 avenue Joliot-Curie
Commune postale: Nanterre Cedex
Code postal: 92020
Pays: France 🇫🇷
Téléphone: +33 140971010📞
Fax: +33 147243161 📠 Procédure d'examen
Informations précises sur le(s) délai(s) des procédures d'examen:
“A claim in a pre-contractual summary proceeding is possible as stated in articles 5 et seq. of Order No. 2009-515 of 7.5.2009 related to complaint...”
Informations précises sur le(s) délai(s) des procédures d'examen
A claim in a pre-contractual summary proceeding is possible as stated in articles 5 et seq. of Order No. 2009-515 of 7.5.2009 related to complaint proceedings applicable to public procurement contracts. The appeal must be lodged before the conclusion of the contract.
A claim in a pre-contractual summary proceeding is possible as stated in articles 11 et seq. of Order No. 2009-515 of 7.5.2009 related to complaint proceedings applicable to public procurement contracts.
The appeal must be lodged at the latest on the thirty first (31) day following the publication of the contract award notice in the Official Journal of the European Union or, for the contracts based on a Framework Agreement or on a dynamic purchasing system, following the notification of the contract signature.
In the absence of publication of the award notice or in the absence of notification of the contract signature, an application to the competent court may be made until the expiry of a six (6) months period starting at the day after the date of conclusion of the contract in accordance with article 1441-3 of the French Code of Civil Procedure.
Afficher plus Service auprès duquel des informations sur la procédure de recours peuvent être obtenues
Nom: Tribunal de grande instance de Nanterre
Adresse postale: 179-191 avenue Joliot-Curie
Commune postale: Nanterre Cedex
Code postal: 92020
Pays: France 🇫🇷
Téléphone: +33 140971010📞
Fax: +33 147243161 📠
Source: OJS 2018/S 198-449406 (2018-10-10)