Contract for civil work detailed design for supercritical coal power plant construction in Rybnik, in Poland (RUDA Project)
The civil work detailed design for reinforced concrete concerning the infrastructure of power block (turbine hall and boiler’s building) including basements, the foundations of the dust collector (Electrostatic precipitator), ID Fan and the auxiliary boiler as well as the detailed design studies for reinforced concrete concerning other complete works like the main electrical building, both staircase towers and the secondary electric buildings. These detailed design studies constitute the complete FUS (For Use) engineering documentation necessary for the execution of the civil works, in compliance with the requirements of the Polish regulations concerning the approval procedure by duly authorized entities.
Date limite
Le délai de réception des offres était de 2012-03-27.
L'appel d'offres a été publié le 2012-02-29.
Qui ?
Qu'est-ce que c'est ?
Où ?
Historique des marchés publics
Date |
Document |
2012-02-29
|
Avis de marché
|
2012-09-07
|
Avis d'attribution de marché
|