Study, manufacturing and installation on site of a complete new reactive power compensation and phases balancer system connected to the catenary network. Technology: STATCOM
Eurotunnel
Study, manufacturing and installation on site of a complete new reactive power compensation and phases balancer system connected to the catenary network.
2 systems will be used in 2 different configurations:
— reactive power compensation,
— phases balancer.
Technology: STATCOM.
Le délai de réception des offres était de 2017-07-16. L'appel d'offres a été publié le 2017-06-30.
Qui ? Qu'est-ce que c'est ? Où ?- • France › Hauts-de-France
- • South East (England) › Kent
Historique des marchés publics
| Date | Document |
|---|---|
| 2017-06-30 | Avis de marché |
Avis de marché (2017-06-30)
Objet
Champ d'application du marché
Titre: Travaux de construction de caténaires
Brève description:
Métadonnées de l'avis
Langue originale: anglais 🗣️
Type de document: Avis de marché
Nature du marché: Services
Réglementation: Union européenne, avec participation des pays de l'AMP
Vocabulaire commun pour les marchés publics (CPV)
Code: Travaux de construction de caténaires 📦
Lieu d'exécution
Région NUTS: Kent 🏙️
Procédure
Type de procédure: Procédure négociée
Type de soumission: Soumission pour tous les lots
Critères d'attribution
Offre la plus économique
Pouvoir adjudicateur
Identité
Pays: France 🇫🇷
Type de pouvoir adjudicateur: Service d'utilité publique
Nom du pouvoir adjudicateur: Eurotunnel
Adresse postale: Maintenance Batiment F94 — BP69
Code postal: 62904
Commune postale: Coquelles
Contact
Adresse Internet: http://www.eurotunnelgroup.com/fr/fournisseurs/marches-et-opportunites 🌏
Courrier électronique: peggy.gouverneur@eurotunnel.com 📧
Téléphone: +33 321004328 📞
URL des documents: http://www.peggy.gouverneur@eurotunnel.com 📧
Référence
Dates
Date d'envoi: 2017-06-30 📅
Date limite de soumission: 2017-07-16 📅
Date de publication: 2017-07-05 📅
Date de début: 2017-10-01 📅
Date de fin: 2019-07-31 📅
Identifiants
Numéro d'avis: 2017/S 126-257680
Numéro JO-S: 126
Informations complémentaires
Objet
Champ d'application du marché
Brève description:
Lieu d'exécution
Site principal ou lieu d'exécution: Eurotunnel Concession: main intake substation on the UK Terminal.
Informations juridiques, économiques, financières et techniques
Conditions de participation
Habilitation à exercer l'activité professionnelle:
Situation économique et financière:
Capacité technique et professionnelle:
Exécution du marché
Dépôts et garanties exigés:
Principales conditions de financement et modalités de paiement et/ou référence aux dispositions pertinentes qui les régissent: Payment conditions at 60 days date of invoice.
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché:
Procédure
Langues dans lesquelles les offres ou les demandes de participation peuvent être présentées: anglais 🗣️
français 🗣️
Pouvoir adjudicateur
Contact
Point de contact: Peggy Gouverneur
Adresse du profil d'acheteur: www.peggy.gouverneur@eurotunnel.com 📧
URL des documents: www.peggy.gouverneur@eurotunnel.com 📧
Référence
Informations complémentaires
Informations complémentaires
Organe de révision
Nom: Tribunal De Grande Instance
Commune postale: Lille
Code postal: 59034
Pays: France 🇫🇷
Téléphone: +33 320783333 📞
Fax: +33 320783452 📠
Organisme responsable des procédures de médiation
Nom: Tribunal De Grande Instance De Lille
Service auprès duquel des informations sur la procédure de recours peuvent être obtenues
Identique à : Organisme responsable des procédures de médiation
Source: OJS 2017/S 126-257680 (2017-06-30)
Objet
Champ d'application du marché
Titre: Travaux de construction de caténaires
Brève description:
Study, manufacturing and installation on site of a complete new reactive power compensation and phases balancer system connected to the catenary network.
2 systems will be used in 2 different configurations:
— reactive power compensation,
— phases balancer.
Technology: STATCOM.
Afficher plus
Langue originale: anglais 🗣️
Type de document: Avis de marché
Nature du marché: Services
Réglementation: Union européenne, avec participation des pays de l'AMP
Vocabulaire commun pour les marchés publics (CPV)
Code: Travaux de construction de caténaires 📦
Lieu d'exécution
Région NUTS: Kent 🏙️
Procédure
Type de procédure: Procédure négociée
Type de soumission: Soumission pour tous les lots
Critères d'attribution
Offre la plus économique
Pouvoir adjudicateur
Identité
Pays: France 🇫🇷
Type de pouvoir adjudicateur: Service d'utilité publique
Nom du pouvoir adjudicateur: Eurotunnel
Adresse postale: Maintenance Batiment F94 — BP69
Code postal: 62904
Commune postale: Coquelles
Contact
Adresse Internet: http://www.eurotunnelgroup.com/fr/fournisseurs/marches-et-opportunites 🌏
Courrier électronique: peggy.gouverneur@eurotunnel.com 📧
Téléphone: +33 321004328 📞
URL des documents: http://www.peggy.gouverneur@eurotunnel.com 📧
Référence
Dates
Date d'envoi: 2017-06-30 📅
Date limite de soumission: 2017-07-16 📅
Date de publication: 2017-07-05 📅
Date de début: 2017-10-01 📅
Date de fin: 2019-07-31 📅
Identifiants
Numéro d'avis: 2017/S 126-257680
Numéro JO-S: 126
Informations complémentaires
As part of the negotiated procedure, Eurotunnel reserves the right to gradually reduce the number of bidders involved in the tender.
Applications to submit bids must reach us in hard-copy and electronic form by e-mail or USB stick. Bidders are required to ensure that their bids are valid for a period of at least three months following opening of envelopes.
Afficher plus
Objet
Champ d'application du marché
Brève description:
Study, manufacturing and installation on site of a complete new reactive power compensation and phases balancer system connected to the catenary network.
2 systems will be used in 2 different configurations:
— reactive power compensation,
— phases balancer.
Technology: STATCOM.
Technology: STATCOM
The supplier will have to base the technical offer on the technical information provided by EUROTUNEL about the catenary network.
Voltage: 25 kV AC.
The equipment will be installed in the perimeter of the main intake substation of the UK Terminal (Folkestone).
The load to be compensated can reach 120 MVAR on each phase.
The system can be operated in the 2 different functions depending of the configuration of the network:
— reactive compensation system,
Or
— phases balancer system.
The supplier will have to provide detailed studies which demonstrate that the new system does fully meet the requirements and specifications.
Those studies will have to demonstrate that the new system does not generate any general problem of stability on the network and electrical interactions with the trains.
Site principal ou lieu d'exécution: Eurotunnel Concession: main intake substation on the UK Terminal.
Informations juridiques, économiques, financières et techniques
Conditions de participation
Habilitation à exercer l'activité professionnelle:
— attestation to the effect that the candidate is not subject to bankruptcy proceedings or similar,
— sworn declaration that it meets its employment-related and tax obligations (for the last 2 years),
— attestation to the effect that it has not been found guilty in civil or criminal proceedings in the last five years, in particular for breaches of the employment legislation, supporting documents proving registration in the companies' register (‘k-bis’ extract),
Afficher plus
— a sworn statement to the effect that the employees will be legally employed — in respect of the duty of care: URSSAF certificate to be provided, named list of foreign workers subject to an attestation of employment or an attestation of non-employment for foreign workers,
Afficher plus
— insurance certificate,
— total workforce/group affiliation.
— turnover and results for the last 3 years for the group,
— turnover and results for the last 3 years for the activity concerned,
— details of subsidiaries,
— parent company.
— ability to mobilise teams to meet deadlines,
— human resources and production means,
— location and commercial presentation of the company,
— safety/quality/environment policy (copy of certificates and accreditation),
— experience or references for similar contracts over the last three years (list of customers with contact details),
— equipment and production means,
— company structure (organisational chart),
— significant references in the railway sphere.
Dépôts et garanties exigés:
First-call bank guarantees for the guarantee of satisfactory fulfilment of contractual obligations, and for the contractual performance guarantee, issued by a first-rate bank in an amount corresponding to 10 % of the total amount of the procurement contract.
Afficher plus
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché:
Group of companies with joint and several liability or single authorised company.
Procédure
Langues dans lesquelles les offres ou les demandes de participation peuvent être présentées: anglais 🗣️
français 🗣️
Pouvoir adjudicateur
Contact
Point de contact: Peggy Gouverneur
Adresse du profil d'acheteur: www.peggy.gouverneur@eurotunnel.com 📧
URL des documents: www.peggy.gouverneur@eurotunnel.com 📧
Référence
Informations complémentaires
As part of the negotiated procedure, Eurotunnel reserves the right to gradually reduce the number of bidders involved in the tender.
Applications to submit bids must reach us in hard-copy and electronic form by e-mail or USB stick. Bidders are required to ensure that their bids are valid for a period of at least three months following opening of envelopes.
Informations complémentaires
Organe de révision
Nom: Tribunal De Grande Instance
Commune postale: Lille
Code postal: 59034
Pays: France 🇫🇷
Téléphone: +33 320783333 📞
Fax: +33 320783452 📠
Organisme responsable des procédures de médiation
Nom: Tribunal De Grande Instance De Lille
Service auprès duquel des informations sur la procédure de recours peuvent être obtenues
Identique à : Organisme responsable des procédures de médiation
Source: OJS 2017/S 126-257680 (2017-06-30)
Nouveaux marchés dans des catégories connexes 🆕
- Travaux de construction (>20 nouveaux marchés)
- Travaux de construction complète ou partielle et travaux de génie civil (>20)
- Travaux de construction de pipelines, de lignes de communication et d'énergie, d'autoroutes, de routes, d'aérodromes et de voies ferrées; travaux de nivelage (>20)
- Travaux de construction de voies ferrées et de systèmes de transport par câble (9)
- Ouvrages ferroviaires (9)
- Chemin de fer interurbain (7)
- Ouvrages ferroviaires urbains (2)
- Travaux de construction d'ateliers de chemin de fer
- Travaux de construction de ballasts
- Travaux de construction de caténaires
- Travaux de construction de sous-stations électriques à usage ferroviaire
- Travaux de construction des passages à niveau