2013-06-04The design, manufacture, supply and installation of new machine-welded metal floor extremities for the BREDA "1st... (Eurotunnel)
The design, manufacture, supply and installation of new machine-welded metal floor extremities for the BREDA "1st generation" HGV carrying railway wagons and removal of the existing floors.
The Contractor is responsible for:
— Analysing documents transmitted,
— On-site surveys,
— Full detailed and working designs,
— Design calculations,
— Drawings and manufacturing packages,
— Dismantling underbody equipment on the ET site (if necessary),
— Reassembling underbody equipment in its original position (if …