Design-construction-operation-maintenance of a storage platform in a port area for repairs of submarine electric power cables

RTE réseau de transport d'électricité

As part of the maintenance of its future offshore connection and interconnection projects, RTE wishes to create a storage site for accessories and for underwater HVAC (notably 225 kV) and HVDC (320 and 525 kV notably) electrical cables). The site is located near a quay in a port in France. This contract concerns the design and construction of the storage site, its operation and maintenance, integrating loading/unloading services at the dock.
Commissioning of the site will take place between May 2026 (first cable delivery) and May 2027.
The contract is not divided in several packages but in one single lot, awarded to a single Holder or Consortium.

Date limite

Le délai de réception des offres était de 2023-12-04. L'appel d'offres a été publié le 2023-10-24.

Qui ? Qu'est-ce que c'est ? Où ?
Historique des marchés publics
Date Document
2023-10-24 Avis de marché
2023-12-11 Informations complémentaires
Avis de marché (2023-10-24)
Objet
Champ d'application du marché
Titre: Services de stockage
Brève description:
As part of the maintenance of its future offshore connection and interconnection projects, RTE wishes to create a storage site for accessories and for underwater HVAC (notably 225 kV) and HVDC (320 and 525 kV notably) electrical cables). The site is located near a quay in a port in France. This contract concerns the design and construction of the storage site, its operation and maintenance, integrating loading/unloading services at the dock. Commissioning of the site will take place between May 2026 (first cable delivery) and May 2027. The contract is not divided in several packages but in one single lot, awarded to a single Holder or Consortium.
Afficher plus
Métadonnées de l'avis
Langue originale: anglais 🗣️
Type de document: Avis de marché
Nature du marché: Services
Réglementation: Union européenne, avec participation des pays de l'AMP
Vocabulaire commun pour les marchés publics (CPV)
Code: Services de stockage 📦
Code CPV supplémentaire: Travaux de construction d'entrepôts 📦
Lieu d'exécution
Région NUTS: France 🏙️

Procédure
Type de procédure: Procédure négociée
Type de soumission: Soumission pour tous les lots
Critères d'attribution
Offre la plus économique

Pouvoir adjudicateur
Identité
Pays: France 🇫🇷
Type de pouvoir adjudicateur: Service d'utilité publique
Nom du pouvoir adjudicateur: RTE Réseau de Transport d'Electricité
Adresse postale: IMMEUBLE WINDOW 7 C PL DU DOME
Code postal: 92073
Commune postale: Paris la defense cedex
Contact
Adresse Internet: http://www.rte-france.com 🌏
Courrier électronique: colin.maillebuau@rte-france.com 📧
Téléphone: +33 632288180 📞
URL des documents: https://rte-france.bravosolution.com 🌏
URL pour la participation: https://rte-france.bravosolution.com 🌏

Référence
Dates
Date d'envoi: 2023-10-24 📅
Date limite de soumission: 2023-12-04 📅
Date de publication: 2023-10-27 📅
Identifiants
Numéro d'avis: 2023/S 208-657101
Numéro JO-S: 208
Informations complémentaires
Services related to cable handling (except for the option relating to CELTIC's temporary stock) are prohibited from subcontracting. In order to prevent any conflict of interest, candidates acting as operators or stockists as well as cable manufacturers are not allowed. Bonus of €50K will be granted to each bidder who submits an admissible offer.
Afficher plus

Objet
Champ d'application du marché
Brève description:
As part of the maintenance of its future offshore connection and interconnection projects, RTE wishes to create a storage site for accessories and for underwater HVAC (notably 225 kV) and HVDC (320 and 525 kV notably) electrical cables). The site is located near a quay in a port in France. This contract concerns the design and construction of the storage site, its operation and maintenance, integrating loading/unloading services at the dock.
Afficher plus
Commissioning of the site will take place between May 2026 (first cable delivery) and May 2027.
The contract is not divided in several packages but in one single lot, awarded to a single Holder or Consortium.
Valeur totale estimée: 37 200 000 EUR 💰
Brève description:
The full description of the services covered by this contract appears in the Application Regulations, attached to the application file.
An excerpt is provided below:
Design and Construction of the storage site for submarine cables:
- Design and construction of an industrial building, of a warehouse type (including preliminary and then detailed studies as well as the preparation of the necessary permitting).
- Design, manufacturing, supply, transport and integration into the building of motorized storage and handling means for submarine cables, as well as heavy storage means, on racks or on the ground, for boxes of cable accessories and for drums. The equipment must be able to ensure the storage of non-coilable portions of cable. Motorization systems (permanent or temporary) will have to be considered: Fixed basket type solutions will not be retained. Storage equipment may have several separate and modular compartments. A cable handling and circulation system for loading/unloading operations from a ship at the dock must be considered, with part of the system being able to be fixed, particularly in the building, as well as parts having to be mobile, particularly for the loading dock area. This system must take into account the minimum bending radius of the cables. The moving elements of the handling system will be stored on site.
Afficher plus
- The site will have an outdoor space serving as a delivery area and temporary storage area. An access control system (enclosure, controlled vehicle access, controlled pedestrian access, lighting, cameras connected to a surveillance center) will guarantee the protection of the site against vandalism and intrusions. Mobile fire fighting systems (fire extinguishers) will be present on the site, primarily aimed at limiting the risk of fire and then its spread (material classification, architecture, hot spot procedure).
Afficher plus
Operation and maintenance of the site :
- The storage of the first cables and accessories will take place in 2026 (CELTIC Program) and will then be phased according to the planning of offshore projects deliveries. For each delivery by ship, the operator must guarantee the integrity of the cables throughout the unloading operation, from the ship interface at quay to storage facilities. The same cautions will be applied for the handling/storage of accessories. In the event of a damage to a cable at sea, the operator must ensure, upon request from RTE, that the requested cable and accessories are made available and any accessories, as well as their transfer to a ship or any other means designated by RTE. Throughout the storage period, the operator must guarantee computerized monitoring of the quantities stored, expiry dates for the products concerned, regular inventories and regular integrity checks of the products concerned. The operator must also guarantee that the building and exteriors are maintained in good condition, by carrying out appropriate preventive and curative maintenance. Finally, the operator must guarantee the proper and uninterrupted operation of cable storage and transport equipment, through the performance of appropriate preventive and curative maintenance. Throughout the storage period, the operator must subscribe to appropriate contracts with external service providers (fluid supply, waste treatment, legal certifications, safety, etc.) in order to ensure the compliant and uninterrupted operation of the entire site.
Afficher plus
Valeur estimée hors TVA: 37 200 000 EUR 💰
Durée de l'accord: 84 mois
Description des renouvellements:
Firm period of 7 years, renewable for 2 periods of 2 years each, for a total duration of 11 years.
Description des options:
o Option to renew site operation and maintenance services for 2 periods of 2 years each;
o Temporary storage option, in Europe, for a maximum period of 12 months, of the CELTIC cable and accessories, on a platform of the candidate, then transferred to RTE storage platform, object of this contract, in particular in the event of a delay in the handover of buildings and storage means during the first delivery of stock scheduled for May 2026 at the earliest;
Afficher plus
o Option to construct an extension to the building with additional long-term storage capacity for repair cables and accessories (hypothesis of a new France-UK interconnection : additional storage and development of the infrastructure accordingly) ;
o Option relative to the management of repair stock in the event of a damage to a cable at sea (temporary storage of accessories, preparation and loading of cables and accessories on the repair vessel; responsibility for the return of unused and/or damaged cables and accessories ). The organization implemented must provide mobilization meeting RTE criteria (365 days/year).
Afficher plus
Each of these options are part of the bidder's offer and may be exercised at the discretion of RTE during Contract handling.
Informations complémentaires:
Services related to cable handling (except for the option relating to CELTIC's temporary stock) are prohibited from subcontracting.
In order to prevent any conflict of interest, candidates acting as operators or stockists as well as cable manufacturers are not allowed.
Bonus of €50K will be granted to each bidder who submits an admissible offer.
Lieu d'exécution
Site principal ou lieu d'exécution:
A greenfield in a harbor provided by RTE, on the Channel façade between Rouen and Dunkirk. The exact location of the site will be communicated later to the selected candidates.

Informations juridiques, économiques, financières et techniques
Conditions de participation
Habilitation à exercer l'activité professionnelle:
List and brief description of conditions:
The candidate must send with its request for participation to this tender :
Candidate established in France:
- The unique identification number (SIREN) issued by INSEE, or identification card justifying registration in the "Répertoire des métiers" (original or copy) dating less than 3 months from the response deadline ; or a receipt for filing the declaration with a business formalities center for legal or natural persons in the process of registration.
Afficher plus
Candidate established outside France:
- a document from the authorities maintaining the professional register or an equivalent document certifying this registration or, for companies currently being created, a document dated less than 3 months from the authority authorized to receive registration in the professional register and attesting to the application for registration in said register;
Afficher plus
- a document mentioning their identity and address or, where applicable, the contact details of their specific tax representative in France.
For all candidates:
- A dated and signed declaration on honor justifying that it does not fall into any of the cases of prohibition on bidding mentioned in articles L. 2141-1 to L. 2141-5 of ordinance no. 2018-1074 of November 26
2018 relating to the legislative part of the public procurement code and that it is in good standing regarding articles L. 5212-1 to L. 5212-11 of the Labor code concerning the employment of disabled workers;
Which is, without being exhaustive:
* sentences handed down by a criminal judge relating to corruption in the broad sense, extortion, influence peddling, illegal taking of interest, fraud, breach of trust, forgery and use of forgery, money laundering, participation in a criminal conspiracy, for acts of terrorism, for narcotics;
Afficher plus
* defects in regularity with regard to social or tax obligations, noted either by a judge, or by the administrations responsible for the collection of taxes, contributions and social contributions, or by labor inspection services and the like;
* reports of judicial liquidations, bankruptcies and receiverships not justifying authorization to continue activities for the foreseeable duration of execution of the public contract noted by the commercial court;
* breach of the rules related to the fight against illegal work, noted by the labor inspection services and assimilated or reported by the latter to State representatives.
Candidate who is part of the EDF group or the Caisse des Dépôts et Consignations (CDC) group :
In order to ensure compliance with the provisions of articles L111-10 et seq. of the French Energy Code, a candidate controlled directly or indirectly by a company in the EDF or CDC group must produce in its application file a declaration indicating its capital links with one or more companies of the EDF or CDC group.
Afficher plus
Those elements produced in French or English must be provided by individual candidates, by each member of a consortium of companies and, where applicable, by the subcontractors presented.
Situation économique et financière:
The candidate must provide balance sheet extracts from the last two years. In the event of a consortium, each member must provide these 2 extracts.
Niveau(x) minimal/minimaux de normes:
The last annual revenue communicated by the candidate (or the sum of the last annual revenues of all the members of the consortium) to RTE must reach at least 10 million euros.
Capacité technique et professionnelle:
The suitability (aptitude) criteria are as follows:
1/ Transmission and compliance of all the documents mentioned below, with clear and concise content. The candidate must provide a list of all documents requested in French or English, for himself as a candidate or as a member in the event of an application of a consortium. All members of the consortium must also provide the required documents (apart from the Aptitude File, summarizing all the skills of each members and subcontractors in a single document; as well as the DC1):
Afficher plus
- Application response framework completed in Excel format
- Presentation of the company, completed in PowerPoint format, to be produced by all members of the group and planned subcontractors
- Aptitude file completed in PowerPoint format (as described in the following paragraph 2/)
- SIREN (for French applicants) or document certifying registration in the professional register
- Letter of application - Designation of the Lead Contractor of the consortium and his co-contractors (DC1), to be produced in a single example for all members of the consortium
- Declaration of the individual candidate or member of the consortium (DC2), to be produced by each members of the consortium
- Declaration on honor justifying the absence of a ban on tendering
- Certificate of non-judicial recovery and if the candidate or one of the members of the consortium is in judicial recovery, copy of the judgment(s) pronounced to this effect
- For candidates belonging to the EDF group or Caisse des dépôts et consignations, an explanatory note of the capital links with the group
- The quality and appropriate delegation of power of the company representative(s) involved in this application
- Extracts from balance sheets from the last two years
2/ Relevance of the technical Aptitude file (limited to 15 pages) in which the candidate will demonstrate his understanding of RTE's need and his ability to respond to it, in terms of technical means (in particular tools, material and technical equipment, software), human means (expertise and experience associated by category of profile), methodological means (expertise in management of similar projects, processes put in place) and organisation proposed to RTE (privileged interlocutor, considered project team and organization chart, organization and distribution between the members of the group and the possible subcontractors, QSE prevention officer, etc.) regarding to:
Afficher plus
- The design and construction of the site and storage means on a greenfield in a port environment close to a quay, allowing long-term storage (40 years) of submarine electrical power cables. Within a limited footprint, this logistics platform must ensure protection and adequate security of the stock in a controlled atmosphere and rapid provision of the stock at the request of RTE;
Afficher plus
- Operation of the site and stock: handling of submarine electrical power cables in accordance with the associated technical constraints and its monitoring throughout the handling in order to guarantee their integrity; interfaces with ships for delivery (including loading/unloading of stock), operations in the event of a damage at a cable at sea (including preparation of stock and means of transporting the cable from the site to the ship); ability to manage a warehouse and its stock (including inspection) in a secure manner; organization capable of operating 24/7 after notification of damage;
Afficher plus
- Preventive and curative maintenance as well as upkeep of the site, in particular of built elements and storage equipment, in order to ensure the proper functioning of the infrastructure at all times and its sustainability.
Niveau(x) minimal/minimaux de normes:
Among the candidates deemed suitable (through the suitability/aptitude criteria), a selection of the 5 best candidates will be made based on the following selection criteria:
- Number and relevance of references in the design of a platform inclusive of a industrial hall, regarding RTE's expressed need in the "Notice", over the last 10 years, indicating the type of customer or end user, the cost, the details of the services provided, the date of creation of the site: 2 points
Afficher plus
- Number and relevance of references in the construction of a platform inclusive of a industrial hall, regarding RTE's expressed need in the "Notice", over the last 10 years, indicating the type of customer or end user, the cost, the details of the services provided, the date of creation of the site: 2 points
Afficher plus
- Number and relevance of references in the design and construction of electrical power cable storage equipment and associated accessories, regarding RTE's expressed need in the "Notice", over the last 10 years, indicating the type of customer or end user, the cost, details of the services provided, the delivery date of the equipment: 5 points
Afficher plus
- Number and relevance of references in the handling of submarine electrical power cables, regarding RTE's expressed need in the "Notice", over the last 5 years, indicating the type of customer or end user, the cost, details of services provided, dates of performance of the service: 6 points
Afficher plus
- Number and relevance of references in the management of a storage platform, regarding RTE's expressed need in the "Notice", over the last 5 years, indicating the type of customer or end user, the cost, the details of the services provided, the dates of completion of the service: 5 points
Afficher plus
The number of references, their relevance to's RTE need, as well as their recentness will be taken into account.
Liste et brève description des règles et critères:
- In accordance with Article R2213-5 of the Public Procurement Code, 10% of the estimated amount of the contract will be entrusted, directly or indirectly, to SMEs.
- Furthermore, in order to prevent any conflict of interest relating to the ownership of cables, applications of candidates acting as operators or stockists as well as cable manufacturers are not allowed.
- Services relating to the handling of cables are prohibited from subcontracting (except for the realization of the option relative to the storage of cables and accessories for the Celtic project).
Exécution du marché
Dépôts et garanties exigés:
Deposits or bank guarantees may be requested and will be indicated in the consultation file
Principales conditions de financement et modalités de paiement et/ou référence aux dispositions pertinentes qui les régissent: Financing from own resources. Payment 49 days from the invoice's date of issue.
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché:
RTE is allowed to ask the consortium to transform it into a "Groupement solidaire" or with a "Mandataire solidaire" when the contract is awarded, to the extent that this transformation is necessary for the proper execution of the contract.
In the event of a consortium application, all of the documents requested in III.1.1) to III.1.3) must be provided by each member (apart from the suitability file, to be provided in a single document, compiling all RTE prerequisites; as well as DC1).
Except in the cases provided for in article R. 2142-26 of the Public Procurement Code, the composition of the consortium applying for a call for competition cannot be modified between the date of submission of applications and the date of signature of the contract.
Afficher plus
A candidate cannot submit several applications by acting at the same time:
1° As individual candidate and member of one or more consortiums;
2° As member of several consortium

Procédure
Base juridique: 32014L0025
Nombre de candidats envisagé: 5
Critères objectifs de sélection du nombre limité de candidats: See paragraph III.1.3
Heure limite de réception des offres: 12:00
Date d'envoi des invitations: 2024-01-10 📅
Langues dans lesquelles les offres ou les demandes de participation peuvent être présentées: français 🗣️
anglais 🗣️
Période de validité de l'offre: 6 mois

Pouvoir adjudicateur
Contact
Point de contact: Colin MAILLEBUAU
Adresse Internet: www.rte-france.com 🌏
Adresse du profil d'acheteur: https://rte-france.bravosolution.com 🌏
URL des documents: https://rte-france.bravosolution.com 🌏

Référence
Informations complémentaires
The documents transmitted by RTE as part of the tendering process will be in French and English versions. Candidates can submit their application and offer in French or English. However, the Contract as well as the Requirements Specifications will be submitted for signature by the successful bidder in the French version.
Afficher plus

Informations complémentaires
Organe de révision
Nom: Tribunal de grande instance de Nanterre
Adresse postale: 179-191, avenue Joliot-Curie
Commune postale: Nanterre Cedex
Code postal: 92020
Pays: France 🇫🇷
Téléphone: +33 140971010 📞
Fax: +33 147243161 📠
Service auprès duquel des informations sur la procédure de recours peuvent être obtenues
Identique à : Organe de révision
Source: OJS 2023/S 208-657101 (2023-10-24)
Informations complémentaires (2023-12-11)
Objet
Champ d'application du marché
Brève description:
Dans le cadre de la maintenance de ses futurs projets de raccordement et d’interconnexions en mer, RTE souhaite créer un site de stockage pour des accessoires et pour des câbles électriques sous-marins HVAC (225 kV notamment) et HVDC (320 et 525 kV notamment). Le site, choisi par RTE, est situé à proximité d’un quai dans un port en France. Le présent marché porte sur les prestations de conception et de construction du site de stockage, son exploitation et sa maintenance, intégrant les services de chargement/déchargement à quai. La mise en service du site s’étalera entre mai 2026 (première livraison de câble) et mai 2027. Le marché fait l'objet d'un lot unique, attribué à un seul Titulaire.
Afficher plus
Métadonnées de l'avis
Langue originale: français 🗣️
Type de document: Informations complémentaires

Référence
Dates
Date d'envoi: 2023-12-11 📅
Date limite de soumission: 2023-12-22 📅
Date de publication: 2023-12-15 📅
Identifiants
Numéro d'avis: 2023/S 242-761124
Se réfère à l'avis: 2023/S 208-657101
Numéro JO-S: 242

Objet
Champ d'application du marché
Brève description:
Dans le cadre de la maintenance de ses futurs projets de raccordement et d’interconnexions en mer, RTE souhaite créer un site de stockage pour des accessoires et pour des câbles électriques sous-marins HVAC (225 kV notamment) et HVDC (320 et 525 kV notamment). Le site, choisi par RTE, est situé à proximité d’un quai dans un port en France. Le présent marché porte sur les prestations de conception et de construction du site de stockage, son exploitation et sa maintenance, intégrant les services de chargement/déchargement à quai.
Afficher plus
La mise en service du site s’étalera entre mai 2026 (première livraison de câble) et mai 2027.
Le marché fait l'objet d'un lot unique, attribué à un seul Titulaire.
Source: OJS 2023/S 242-761124 (2023-12-11)