The Biscay Gulf Electrical Interconnection (BGE) consists of the construction of a 2 000 MW link. This link is composed of two (2) circuits rated 1 000 MW each for DC operating voltage of 400 kV, in total comprised of four (4) power cables, four (4) converter station terminals located close to 400 kV Gatica substation (Spain) and Cubnezais substation (France). The length of the route is estimated to be approximately 400 km long starting in Spanish País Vasco region (near Bilbao) to an ending point in Nouvelle Aquitaine (Gironde department, near Bordeaux). The interconnection is composed of underground cables with total approximate route length of 115 km and submarine cables with total approximate route length of 285 km.
The ‘BGE’ is a joint project developed by INELFE on behalf of Réseau Transport d’Electricité (RTE) and Red Eléctrica de España (REE) respectively the transmission system operators in France and Spain.
The project is supported by the European Union’s Connecting Europe.
Date limite
Le délai de réception des offres était de 2021-06-14.
L'appel d'offres a été publié le 2021-04-15.
Fournisseurs
Les fournisseurs suivants sont mentionnés dans les décisions d'attribution ou dans d'autres documents relatifs aux marchés publics :
Avis de marché (2021-04-15) Pouvoir adjudicateur Nom et adresse
Nom: INELFE — Interconexión Eléctrica Francia-España
Adresse postale: c/o RTE — Immueble WINDOW – 7C Place du Dôme
Commune postale: Paris la Défense
Code postal: 92073
Pays: France 🇫🇷
Personne de contact:
“Carlos Sastre Gallego (carlos.sastre@ree.es); Rafael García Fernández (rafgarcia@ree.es)”
Téléphone: +34 916599964📞
Courrier électronique: rafgarcia@ree.es📧
Région: France🏙️
URL: www.inelfe.eu🌏
Adresse du profil d'acheteur: https://rte-france.bravosolution.com/fr/login.html🌏 Informations sur la passation conjointe de marchés
Le marché est attribué par une centrale d'achat
Communication
URL des documents: http://www.inelfe.eu🌏
URL de participation: https://rte-france.bravosolution.com/fr/login.html🌏
Objet Champ d'application du marché
Titre:
“INELFE — Biscay Gulf — Electrical Interconnection FR-SP — Terrestrial Civil Works (4 X HVDC 400 kV Cables and 2 X Fiber Optic Cable)”
Produits/services: Travaux de construction📦
Brève description:
“The Biscay Gulf Electrical Interconnection (BGE) consists of the construction of a 2 000 MW link. This link is composed of two (2) circuits rated 1 000 MW...”
Brève description
The Biscay Gulf Electrical Interconnection (BGE) consists of the construction of a 2 000 MW link. This link is composed of two (2) circuits rated 1 000 MW each for DC operating voltage of 400 kV, in total comprised of four (4) power cables, four (4) converter station terminals located close to 400 kV Gatica substation (Spain) and Cubnezais substation (France). The length of the route is estimated to be approximately 400 km long starting in Spanish País Vasco region (near Bilbao) to an ending point in Nouvelle Aquitaine (Gironde department, near Bordeaux). The interconnection is composed of underground cables with total approximate route length of 115 km and submarine cables with total approximate route length of 285 km.
The ‘BGE’ is a joint project developed by INELFE on behalf of Réseau Transport d’Electricité (RTE) and Red Eléctrica de España (REE) respectively the transmission system operators in France and Spain.
The project is supported by the European Union’s Connecting Europe.
1️⃣
Produits/services supplémentaires: Travaux de construction de lignes électriques📦
Lieu d'exécution: España 🏙️
Lieu d'exécution: France🏙️
Site principal ou lieu d'exécution:
“País Vasco region in Spain and Nouvelle Aquitaine – Gironde department in France.”
Description du marché:
“Terrestrial Civil Works designated for the installation of four (4) power cables ducts plus optic fiber cables ducts of a total underground cable route...”
Description du marché
Terrestrial Civil Works designated for the installation of four (4) power cables ducts plus optic fiber cables ducts of a total underground cable route length of approximately 15 km in Spanish side (landfall works excluded) and 100 km in French side (landfall works excluded).
The scope includes the design (including detail design), engineering, procurement and construction (including trenchless solution to cross Dordogne and Garonne rivers in France and smaller sections in Spain). The lengths given are approximate and may be varied for route adjustments.
The applicants must note that to perform the works, the economic operator must be qualified for the referenced type of works in the RTE qualification system or in the REE qualification system. For the execution the works in the territory where the applicant is not qualified, the applicant shall entirely subcontract to qualified subcontractor(s) related to the relevant territory (Spain or France respectively). This qualification is required for the applicant at time of request to participate and shall be maintained valid until the completion of works.
Further detail of the scope of the contract shall be provided in the Invitation to Tender (ITT) documents.
The contracting entity will be INELFE in its name and on behalf of REE and RTE as a central purchasing body.
Afficher plus Critères d'attribution
Le prix n'est pas le seul critère d'attribution et tous les critères ne sont énoncés que dans les documents de passation de marchés
Durée de l'accord
Date de début: 2023-05-10 📅
Date de fin: 2025-08-25 📅
Informations sur les limites du nombre de candidats à inviter
Nombre de candidats envisagé: 10
Informations sur les options
Options ✅
Description des options: Further details will be provided in ITT.
Champ d'application du marché
Informations sur les fonds de l'Union européenne:
“Biscay gulf electrical interconnection FR-ES — Connecting Europe Facility programme — Trans-European Energy (ref. 2.7-0013-FRES-W-M-17).” Description
Informations complémentaires:
“Official communications shall be conducted via message board on the project’s e-sourcing platform. All communications throughout the tender process related...”
Informations complémentaires
Official communications shall be conducted via message board on the project’s e-sourcing platform. All communications throughout the tender process related to the INELFE Biscay of Gulf project must be sent via this way. Any communications not sent via this e-sourcing portal may not receive any response.
INELFE, RTE and REE will not accept any responsibility should this happen.
Informations juridiques, économiques, financières et techniques Conditions de participation
Liste et brève description des conditions:
“The applicant shall have a valid RTE or REE qualification for the referenced type of works (see also Section II.2.4) and consequently has to be qualified at...”
Liste et brève description des conditions
The applicant shall have a valid RTE or REE qualification for the referenced type of works (see also Section II.2.4) and consequently has to be qualified at qualification system of RTE or REE to perform its activity(ies) in France/Spain as applicable.
If necessary, provided the Applicant is referenced only in RTE or REE qualification system, the proposed sub-contractors for the works on the territory not covered by the qualification, shall have a valid RTE or REE qualification for the referenced type of works (see also Section II.2.4) and consequently have to be registered at qualification system of RTE/REE to perform their activity(ies) in France/Spain respectively.
All costs of completing and submitting any submission and any presentations of the submission are the responsibility of the applicant(s).
Throughout the course of this procurement process, tenderers may be asked to translate and resubmit documents in French and/or in Spanish at their own expense.
“— the applicant shall demonstrate an annual turnover average for the last three (3) financial years at least equal to EUR 110 000 000 (or equivalent;
— in...”
— the applicant shall demonstrate an annual turnover average for the last three (3) financial years at least equal to EUR 110 000 000 (or equivalent;
— in case of consortia, at least two of the members, shall comply with above criteria.
Afficher plus Capacité technique et professionnelle
Liste et brève description des critères de sélection:
“The applicants must note that to perform the works, the economic operator, must be qualified for the referenced type of works in the RTE qualification...”
Liste et brève description des critères de sélection
The applicants must note that to perform the works, the economic operator, must be qualified for the referenced type of works in the RTE qualification system or in the REE qualification system.
In case the applicant, is only qualified in one of the RTE/REE systems, then the execution the works in the territory where it is not qualified, the applicant must be entirely subcontracted to qualified subcontractor(s) related to the relevant territory (Spain or France respectively). These qualifications are required for the applicants at time of request to participate and shall be maintained valid until the completion of works.
Afficher plus Conditions de participation
Liste et brève description des règles et critères:
“To participate in tender, the economic operator must be qualified for the referenced type of works in the RTE qualification system or in the REE...”
Liste et brève description des règles et critères
To participate in tender, the economic operator must be qualified for the referenced type of works in the RTE qualification system or in the REE qualification system.
In case the applicant, is only qualified in one of the RTE/REE systems, then the execution the works in the territory where it is not qualified, the applicant shall entirely subcontract to qualified subcontractor(s) related to the relevant territory (Spain or France respectively). These qualifications are required for the applicants at time of request to participate and shall be maintained valid until the completion of works.
For more information on the qualification procedures of RTE and REE, please refer to https://www.rte-france.com/fr/portail/les-fournisseurs and https://www.ree.es/en/suppliers/how-to-become-a-supplier.
Afficher plus
Dépôts et garanties exigés:
“Guarantees and bonds will be required, the types and amounts will be defined/prescribed in the ITT, according to the applicable Law.”
Principales conditions de financement et modalités de paiement et/ou référence aux dispositions pertinentes qui les régissent:
“Main financial conditions and payment arrangements will be prescribed in the ITT.”
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché:
“Applicants may submit bids either as:
— single company with proposed sub-contractors if necessary;
— consortium with proposed sub-contractors if...”
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché
Applicants may submit bids either as:
— single company with proposed sub-contractors if necessary;
— consortium with proposed sub-contractors if necessary.
In case of applicants submit bids as a consortium, applications shall be submitted either by all the members of consortium or by an agent who provides proof of the necessary authorizations to represent the other members of the consortium. Same economic operator may not be an agent of more than one Consortium for same contract.
INELFE reserves its right to require economic operators to whom the contract is to be awarded to take a particular legal form to be detailed in the assessment process and/or in the ITT (joint only or joint and several liability), for the performance of contract insofar as this is necessary for such proper performance.
Assessment responses will be required from all members of consortium. Any change in the form and/or composition at any point of the procedure shall be prior-approved in writing by INELFE.
Procédure Type de procédure
Procédure négociée avec mise en concurrence préalable
Informations administratives
Délai de réception des offres ou des demandes de participation: 2021-06-14
12:00 📅
Date estimée d'envoi des invitations à soumissionner ou à participer aux candidats sélectionnés: 2021-10-26 📅
Langues dans lesquelles les offres ou les demandes de participation peuvent être présentées: anglais 🗣️
Le délai ci-dessous est exprimé en nombre de mois.
Délai minimum pendant lequel le soumissionnaire doit maintenir l'offre: 12
“The contract notice is under French law. The time for this contract notice is the French time. The applicable law of the future contracts will be French...”
The contract notice is under French law. The time for this contract notice is the French time. The applicable law of the future contracts will be French law. Official communications shall be conducted via the message board of e-procurement, namely https://rte-france.bravosolution.com
The duration of contract stated in Section II.2.7) refers to construction works with exclusion of defects rectification initial mandatory period.
Applicants wishing to participate in the pre-qualification process must request to participate via dedicated platform and provide:
I. For single company — company name, main contact name and main contact address completed;
II. For consortia — brief description of consortium structure, companies names, leader, percentage of composition, main contact name and main contact address with contemplated list of main sub-contractors if necessary. There will be required a binding letter with all participants signed by each company legal representative with power of attorney indicating the percentage of participation.
The main sub-contractors shall be understood as the ones that, the construction and/or manufacturing capacities are essential for project, and the proposal is based on.
The selected candidates will be populated on https://rte-france.bravosolution.com after the closing of this contract notice and following the return of signed Non-Disclosure Agreement (NDA). The dedicated form will be provided to applicants once the expression of interest in participating in this event issued and accepted by INELFE. The NDA shall be returned to INELFE within five (5) working days after receipt.
In case of consortium, each of the entities has to submit the documents required.
INELFE reserves its right to exclude consortium applicants that would change their composition partway through the process without prior approval from INELFE.
Applicants shall note that the aspects and proposed solutions for social insertion criteria may be set-out in the ITT and will be part of award criteria.
Applicants shall note that the aspects of ECOdesign and Eco-performance may be prescribed in the ITT as part of candidate’s selection criteria and proposed solutions may be evaluated as part of award criteria.
INELFE intends to procure the ‘Biscay Gulf Electrical Interconnection FR-ES Project’ through a series of contracts comprising:
— 1 contract for converter stations;
— 2 contracts for cable link;
— 1 contract for terrestrial civil works.
The candidates to whom the contracts are awarded will be required to accept the coordination and collaboration obligations regarding interfaces with other contractors that are involved in the execution of the Biscay Gulf Electrical Interconnection FR-ES Project.
Such requirements regarding interfaces between such contracts and this contract will be further detailed in the ITT documents.
INELFE reserves its right to specify the conditions above mentioned in the ITT documents.
This contract notice publication will replace the previous uncancelled contract notice 2018/S 238-544692 issued on 11 December 2018 and its relevant corrigendum contract notice 2019/S 017-037085 published on 24 January 2019 for the same scope of works.
Afficher plus Organe de révision
Nom:
“Tribunal de grande instance de Nanterre — Instance chargée des procédures de recours”
Adresse postale: 179-191, Avenue Joliot-Curie
Commune postale: Nanterre
Code postal: 92020
Pays: France 🇫🇷
Téléphone: +33 140971010📞 Procédure d'examen
Informations précises sur le(s) délai(s) des procédures d'examen:
“A claim in a pre-contractual summary proceeding is possible as stated in articles 5 and seq. of Order No 2009-515 of 7 May 2009 related to complaint...”
Informations précises sur le(s) délai(s) des procédures d'examen
A claim in a pre-contractual summary proceeding is possible as stated in articles 5 and seq. of Order No 2009-515 of 7 May 2009 related to complaint proceedings applicable to public procurement contracts. The claim must be lodged before the conclusion of the contract.
A claim in a contractual summary proceeding is possible as stated in articles 11 and seq. of Order No 2009-515 of 7 May 2009 related to complaint proceedings applicable to public procurement contracts.
The claim must be lodged at the latest on the thirty first (31) day following the publication of the contract award notice in the Official Journal of the European Union or, for the contracts based on a framework agreement or on a Dynamic Purchasing System, following the notification of the contract signature. In the absence of publication of the award notice or in the absence of notification of the contract signature, an application to the competent court may be made until the expiry of a six (6) months period starting at the day after the date of conclusion of the contract in accordance with article 1441-3 of the French Code of Civil Procedure.
Afficher plus Service auprès duquel des informations sur la procédure de recours peuvent être obtenues
Nom:
“Tribunal de grande instance de Nanterre — Instance chargée des procédures de recours”
Adresse postale: 179-191, Avenue Joliot-Curie
Commune postale: Nanterre
Code postal: 92020
Pays: France 🇫🇷
Téléphone: +33 140971010📞
Source: OJS 2021/S 076-195449 (2021-04-15)
Informations complémentaires (2021-05-17) Pouvoir adjudicateur Nom et adresse
Commune postale: Paris La Defense
Objet Champ d'application du marché
Titre:
“INELFE — Biscay Gulf — Electrical Interconnection FR-SP — Terrestrial Civil Works (4 x HVDC 400 KV Cables and 2 x Fiber Optic Cable)”
Brève description:
“The Biscay Gulf Electrical Interconnection (BGE) consists of the construction of a 2.000 MW link. This link is composed of two (2) circuits rated 1 000 MW...”
Brève description
The Biscay Gulf Electrical Interconnection (BGE) consists of the construction of a 2.000 MW link. This link is composed of two (2) circuits rated 1 000 MW each for DC operating voltage of 400 kV, in total comprised of four (4) power cables, four (4) converter station terminals located close to 400 kV Gatica substation (Spain) and Cubnezais substation (France). The length of the route is estimated to be approximately 400 km long starting in Spanish País Vasco region (near Bilbao) to an ending point in Nouvelle Aquitaine (Gironde department, near Bordeaux). The interconnection is composed of underground cables with total approximate route length of 115 km and submarine cables with total approximate route length of 285 km.
The ‘BGE’ is a joint project developed by INELFE on behalf of Réseau Transport d’Electricité (RTE) and Red Eléctrica de España (REE) respectively the transmission system operators in France and Spain.
The project is supported by the European Union’s Connecting Europe.
Informations complémentaires Référence de l'avis original
Numéro de l'avis au JO S: 2021/S 076-195449
Changements Texte à corriger dans l'avis original
Numéro de section: II.2.4)
Emplacement du texte à modifier: Description of the procurement:
Ancienne valeur
Texte:
“Terrestrial Civil Works designated for the installation of four (4) power cables ducts plus optic fiber cables ducts of a total underground cable route...”
Texte
Terrestrial Civil Works designated for the installation of four (4) power cables ducts plus optic fiber cables ducts of a total underground cable route length of approximately 15 km in Spanish side (landfall works excluded) and 100 km in French side (landfall works excluded). The scope includes the design (including detail design), engineering, procurement and construction (including trenchless solution to cross Dordogne and Garonne rivers in France and smaller sections in Spain). The lengths given are approximate and may be varied for route adjustments. The applicants must note that to perform the works, the economic operator must be qualified for the referenced type of works in the RTE qualification system or in the REE qualification system. For the execution the works in the territory where the applicant is not qualified, the applicant shall entirely subcontract to qualified subcontractor(s) related to the relevant territory (Spain or France respectively). This qualification is required for the applicant at time of request to participate and shall be maintained valid until the completion of works.Further detail of the scope of the contract shall be provided in the Invitation to Tender (ITT) documents.The contracting entity will be INELFE in its name and on behalf of REE and RTE as a central purchasing body.
Afficher plus Nouvelle valeur
Texte:
“Terrestrial Civil Works designated for the installation of four (4) power cables ducts plus optic fiber cables ducts of a total underground cable route...”
Texte
Terrestrial Civil Works designated for the installation of four (4) power cables ducts plus optic fiber cables ducts of a total underground cable route length of approximately 15 km in Spanish side (landfall works excluded) and 100 km in French side (landfall works excluded). The scope includes the design (including detail design), engineering, procurement and construction (including trenchless solution to cross Dordogne and Garonne rivers in France and smaller sections in Spain). The lengths given are approximate and may be varied for route adjustments. The applicants must note that to perform the works, the economic operator must be qualified for the referenced type of works in the RTE qualification system or in the REE qualification system. For the execution the works in the territory where the applicant is not qualified, the applicant shall entirely subcontract to qualified subcontractor(s) related to the relevant territory (Spain or France respectively). This qualification is required for the applicant at time of request to participate and shall be maintained valid until the completion of works. In case the economic operator is a consortia, at least the leader of the consortia (highest percentage of participation) must be qualified as it appears in RTE´s and REE´s qualification system. Consortia’s other members (non qualified ones) would be allowed but It won´t be possible they perform any core activities. Further detail of the scope of the contract shall be provided in the Invitation to Tender (ITT) documents. The contracting entity will be INELFE in its name and on behalf of REE and RTE as a central purchasing body.
Afficher plus
Source: OJS 2021/S 098-259161 (2021-05-17)
Informations complémentaires (2021-06-10) Pouvoir adjudicateur Nom et adresse
Commune postale: Paris La Défense
Objet Champ d'application du marché
Titre:
“Inelfe — Biscay Gulf — Electrical Interconnection FR-SP — Terrestrial Civil Works (4 X HVDC 400 kV Cables and 2 X Fiber Optic Cable)”
Changements Texte à corriger dans l'avis original
Numéro de section: III.1.2)
Emplacement du texte à modifier: Economic and financial standing
Ancienne valeur
Texte:
“— the applicant shall demonstrate an annual turnover average for the last three (3) financial years at least equal to EUR 110 000 000 (or equivalent);
— in...”
Texte
— the applicant shall demonstrate an annual turnover average for the last three (3) financial years at least equal to EUR 110 000 000 (or equivalent);
— in case of consortia, at least two of the members, shall comply with above criteria.
Afficher plus Nouvelle valeur
Texte:
“— the applicant shall demonstrate an annual turnover average for the last three (3) financial years at least equal to EUR 110 000 000 (or equivalent);
— in...”
Texte
— the applicant shall demonstrate an annual turnover average for the last three (3) financial years at least equal to EUR 110 000 000 (or equivalent);
— in case of consortia, at least two of the members shall comply with above criteria by itself or by its parent company (via a parent company guarantee).
Afficher plus Texte à corriger dans l'avis original
Numéro de section: IV.2.2)
Emplacement du texte à modifier: Time limit for receipt of tenders or requests to participate
Ancienne valeur
Date: 2021-06-14 📅
L'heure: 12:00
Nouvelle valeur
Date: 2021-06-29 📅
L'heure: 12:00
Autres informations complémentaires
Refers to previous contract notices: 2021/S 076-195449 and 2021/S 098-259161
Source: OJS 2021/S 114-300750 (2021-06-10)
Avis d'attribution de marché (2024-01-08) Pouvoir adjudicateur Nom et adresse
Nom: INELFE - Interconexión Eléctrica Francia-España
Adresse postale: c/o RTE - Immueble WINDOW – 7C Place du Dôme
Commune postale: Paris (La Defense)
Objet Champ d'application du marché
Titre:
“INELFE - BISCAY GULF - ELECTRICAL INTERCONNECTION FR-SP - TERRESTRIAL CIVIL WORKS (4 X HVDC 400 kV CABLES AND 2 X FIBER OPTIC CABLE)”
Brève description:
“The Biscay Gulf Electrical Interconnection (BGE) consists of the construction of a 2.000 MW link. This link is composed of two (2) circuits rated 1.000 MW...”
Brève description
The Biscay Gulf Electrical Interconnection (BGE) consists of the construction of a 2.000 MW link. This link is composed of two (2) circuits rated 1.000 MW each for DC operating voltage of 400 kV, in total comprised of four (4) power cables, four (4) converter station terminals located close to 400 kV Gatica substation (Spain) and Cubnezais substation (France). The length of the route is estimated to be approximately 400 km long starting in Spanish País Vasco region (near Bilbao) to an ending point in Nouvelle Aquitaine (Gironde department, near Bordeaux). The interconnection is composed of underground cables with total approximate route length of 115 km and submarine cables with total approximate route length of 285 km.
The “BGE” is a joint project developed by INELFE on behalf of Réseau Transport d’Electricité (RTE) and Red Eléctrica de España (REE) respectively the transmission system operators in France and Spain.
The project supported by European Union’s Connecting Europe Facility.
Afficher plus Description
Description du marché:
“Terrestrial Civil Works designated for the installation of four (4) power cables ducts plus optic fiber cables ducts of a total underground cable route...”
Description du marché
Terrestrial Civil Works designated for the installation of four (4) power cables ducts plus optic fiber cables ducts of a total underground cable route length of approximately 15 km in Spanish side (landfall works excluded) and 100 km in French side (landfall works excluded).
The scope includes the design (including detail design), engineering, procurement and construction (including trenchless solution to cross Dordogne and Garonne rivers in France and smaller sections in Spain). The lengths given are approximate and may be varied for route adjustments.
The Applicants must note that to perform the works, the economic operator must be qualified for the referenced type of works in the RTE qualification system or in the REE qualification system. For the execution the works in the territory where the Applicant is not qualified, the Applicant shall entirely subcontract to qualified subcontractor(s) related to the relevant territory (Spain or France respectively). This qualification is required for the Applicant at time of request to participate and shall be maintained valid until the completion of works.
Further detail of the scope of the contract shall be provided in the Invitation to Tender (ITT) documents.
The contracting entity will be INELFE in its name and on behalf of REE and RTE as a central purchasing body.
Afficher plus Champ d'application du marché
Informations sur les fonds de l'Union européenne:
“Biscay Gulf Electrical Interconnection FR-ES - Connecting Europe Facility programme - Trans-European Energy (ref. 2.7-0013-FRES-W-M-17).”
Procédure Informations administratives
Publication précédente concernant cette procédure: 2021/S 076-195449
Attribution du marché
1️⃣
Numéro de contrat: 1
Titre:
“INELFE - BISCAY GULF - ELECTRICAL INTERCONNECTION FR-SP - TERRESTRIAL CIVIL WORKS (4 X HVDC 400 kV CABLES AND 2 X FIBER OPTIC CABLE)”
Date de conclusion du contrat: 2023-12-19 📅
Informations sur les appels d'offres
Le contrat a été attribué à un groupe d'opérateurs économiques ✅ Nom et adresse du contractant
Nom: Razel-bec sas
Commune postale: Paris
Code postal: 91892
Pays: France 🇫🇷
Région: Paris🏙️
Le contractant est une PME
Nom: Fayat entreprise t.p. s.a.s
Commune postale: Libourne, France
Code postal: 33502
Région: France🏙️
Nom: Fayat power
Commune postale: Nanterre
Code postal: 92000
Nom: E.t.p.m. de travaux publics multiples
Commune postale: Arcangues
Code postal: 64200
Nom: Serpollet
Commune postale: Vénissieux
Code postal: 69200
Nom: Semi france s.a.s.u.
Code postal: 75015
Nom: Sociedad española de montajes industriales sa
Commune postale: Madrid
Code postal: 28050
Pays: Espagne 🇪🇸
Région: Madrid 🏙️
“The contract notice is under French law. The time for this contract notice is the French time. The applicable law of the future contracts will be French...”
The contract notice is under French law. The time for this contract notice is the French time. The applicable law of the future contracts will be French law. Official communications shall be conducted via the message board of e-procurement, namely https://rte-france.bravosolution.com.
The duration of contract stated in Section II.2.7 refers to construction works with exclusion of defects rectification initial mandatory period.
Applicants wishing to participate in the pre-qualification process must request to participate via dedicated platform and provide:
(I) for single company - company name, main contact name and main contact address completed.
(II) for Consortia - brief description of Consortium structure, companies names, leader, percentage of composition, main contact name and main contact address with contemplated list of main sub-contractors if necessary. There will be required a binding letter with all participants signed by each company legal representative with power of attorney indicating the percentage of participation.
The main sub-contractors shall be understood as the ones that, the construction and/or manufacturing capacities are essential for project, and the proposal is based on.
The selected candidates will be populated on https://rte-france.bravosolution.com after the closing of this contract notice and following the return of signed Non-Disclosure Agreement (NDA). The dedicated form will be provided to applicants once the expression of interest in participating in this event issued and accepted by INELFE. The NDA shall be returned to INELFE within five (5) working days after receipt.
In case of Consortium, each of the entities has to submit the documents required.
INELFE reserves its right to exclude Consortium applicants that would change their composition partway through the process without prior approval from INELFE.
Applicants shall note that the aspects and proposed solutions for social insertion criteria may be set-out in the ITT and will be part of award criteria.
Applicants shall note that the aspects of ECOdesign and Eco-performance may be prescribed in the ITT as part of candidate’s selection criteria and proposed solutions may be evaluated as part of award criteria.
INELFE intends to procure the “Biscay Gulf Electrical Interconnection FR-ES Project” through a series of contracts comprising:
- 1 contract for converter stations.
- 2 contracts for cable link.
- 1 contract for terrestrial civil works.
The candidates to whom the contracts are awarded will be required to accept the coordination and collaboration obligations regarding interfaces with other contractors that are involved in the execution of the Biscay Gulf Electrical Interconnection FR-ES Project.
Such requirements regarding interfaces between such contracts and this contract will be further detailed in the ITT documents.
INELFE reserves its right to specify the conditions above mentioned in the ITT documents.
This contract notice publication will replace the previous uncancelled contract notice 2018/S 238-544692 issued on 2018 December 11th and its relevant corrigendum contract notice 2019/S 017-037085 published on 2019 January 24th for the same scope of works.
Afficher plus Organe de révision
Nom:
“Tribunal de grande instance de Nanterre - Instance chargée des procédures de recours” Procédure d'examen
Informations précises sur le(s) délai(s) des procédures d'examen:
“A claim in a precontractual summary proceeding is possible as stated in articles 5 et seq. of Order N° 2009-515 of 7.5.2009 related to complaint proceedings...”
Informations précises sur le(s) délai(s) des procédures d'examen
A claim in a precontractual summary proceeding is possible as stated in articles 5 et seq. of Order N° 2009-515 of 7.5.2009 related to complaint proceedings applicable to public procurement contracts. The claim must be lodged before the conclusion of the contract.
A claim in a contractual summary proceeding is possible as stated in articles 11 et seq. of Order N° 2009-515 of 7.5.2009 related to complaint proceedings applicable to public procurement contracts.
The claim must be lodged at the latest on the thirty first (31st) day following the publication of the contract award notice in the Official Journal of the European Union or, for the contracts based on a framework agreement or on a Dynamic purchasing system, following the notification of the contract signature. In the absence of publication of the award notice or in the absence of notification of the contract signature, an application to the competent court may be made until the expiry of a six (6) months period starting at the day after the date of conclusion of the contract in accordance with article 1441-3 of the French Code of Civil Procedure.
Afficher plus Service auprès duquel des informations sur la procédure de recours peuvent être obtenues
Nom:
“Tribunal de grande instance de Nanterre - Instance chargée des procédures de recours”
Source: OJS 2024/S 009-021563 (2024-01-08)