Ferme Eolienne Flottante de Groix & Belle-Ile (FEFGBI) Floating Offshore Windfarm — Supply and Installation of 66 kV Submarine and Undergound Power Cables
The purpose of this notice is to achieve:
— 2 EPCI including the survey, design, engineering and compliance testing, procurement, manufacturing, construction, installation, burial and protection, completion, on-site testing, pre-commissioning, trial operation, spares provision and other services for:
RTE's scope: underground export cable and accessories and optical fiber cable (only supply and assembly), landfall transition joint, submarine export cable (static and dynamic, optical fiber included) subsea accessories and associated equipments and services.
FEFGBI's scope: inter-array dynamic cables, subsea accessories and associated equipments and services.
— an Inspection Maintenance and Repair (IMR) contract for the RTE's scope,
— an Inspection Maintenance and Repair (IMR) contract for the FEFGBI's scope.
Date limite
Le délai de réception des offres était de 2019-03-25.
L'appel d'offres a été publié le 2019-03-04.
Avis de marché (2019-03-04) Objet Champ d'application du marché
Titre: Travaux de construction de lignes électriques
Brève description:
“The purpose of this notice is to achieve:” Métadonnées de l'avis
Langue originale: anglais 🗣️
Type de document: Avis de marché
Nature du marché: Marché de travaux
Réglementation: Union européenne, avec participation des pays de l'AMP
Vocabulaire commun pour les marchés publics (CPV)
Code: Travaux de construction de lignes électriques📦
Code CPV supplémentaire: Services offshore de navires ravitailleurs📦 Lieu d'exécution
Région NUTS: Languedoc-Roussillon🏙️
Procédure
Type de procédure: Procédure négociée
Type de soumission: Soumission pour tous les lots
Critères d'attribution
Offre la plus économique
Référence Dates
Date d'envoi: 2019-03-04 📅
Date limite de soumission: 2019-03-25 📅
Date de publication: 2019-03-07 📅
Date de début: 2020-05-01 📅
Date de fin: 2027-12-31 📅
Identifiants
Numéro d'avis: 2019/S 047-108770
Numéro JO-S: 47
Informations complémentaires
“If the applicant is a JV/consortium or a single company/group, the entity responsible for installing the submarine cable system as well as the entity...”
If the applicant is a JV/consortium or a single company/group, the entity responsible for installing the submarine cable system as well as the entity responsible for manufacturing the submarine cable system (static and dynamic) will be expected to have a direct contractual relationship with RTE/FEFGBI.
Afficher plus
Source: OJS 2019/S 047-108770 (2019-03-04)