Floating photovoltaic power plant project in France — Turnkey contract for Engineering, Procurement, Construction, Testing and Commissioning

EDF EN France

The procurement aims at providing a ‘turnkey contract’ including the Engineering, Procurement, Construction, Testing and Commissioning for a floating photovoltaic power plant project located in France. Only the procurement of the photovoltaic modules is not to be included in the turnkey contract, since such modules will be provided by the Employer directly.

Date limite
Le délai de réception des offres était de 2017-12-05. L'appel d'offres a été publié le 2017-11-14.

Qui ?

Qu'est-ce que c'est ?

Où ?

Historique des marchés publics
Date Document
2017-11-14 Avis de marché