TERRE is a pilot project set by ENTSO-E for cross-border exchanges of balancing reserves between Transmission System Operators (TSOs). It is one among several initiatives to implement the Electricity Balancing Guideline (network code). 6 European TSOs are directly involved as partners: National Grid (GB), REE (Spain), REN (Portugal), RTE (France), Swiss Grid (Switzerland) and TERNA (Italy). A 7th, ADMIE (Greece), acts as observer. The short term objective of the TERRE platform is to support exchange of Replacement Reserves (RR) on a regional level. In a subsequent phase, the platform may support also the exchange of manual frequency Restoration Reserves (mFRR). The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs' local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs' imbalance needs.
Date limite
Le délai de réception des offres était de 2016-09-09.
L'appel d'offres a été publié le 2016-08-01.
Fournisseurs
Les fournisseurs suivants sont mentionnés dans les décisions d'attribution ou dans d'autres documents relatifs aux marchés publics :
Avis de marché (2016-08-01) Objet Champ d'application du marché
Titre: Services de technologies de l'information, conseil, développement de logiciels, internet et appui
Numéro de référence: 16854
Brève description:
TERRE is a pilot project set by ENTSO-E for cross-border exchanges of balancing reserves between Transmission System Operators (TSOs). It is one among several initiatives to implement the Electricity Balancing Guideline (network code).
6 European TSOs are directly involved as partners: National Grid (GB), REE (Spain), REN (Portugal), RTE (France), Swiss Grid (Switzerland) and TERNA (Italy). A 7th, ADMIE (Greece), acts as observer.
The short term objective of the TERRE platform is to support exchange of Replacement Reserves (RR) on a regional level. In a subsequent phase, the platform may support also the exchange of manual frequency Restoration Reserves (mFRR).
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs' local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs' imbalance needs.
TERRE is a pilot project set by ENTSO-E for cross-border exchanges of balancing reserves between Transmission System Operators (TSOs). It is one among several initiatives to implement the Electricity Balancing Guideline (network code).
6 European TSOs are directly involved as partners: National Grid (GB), REE (Spain), REN (Portugal), RTE (France), Swiss Grid (Switzerland) and TERNA (Italy). A 7th, ADMIE (Greece), acts as observer.
The short term objective of the TERRE platform is to support exchange of Replacement Reserves (RR) on a regional level. In a subsequent phase, the platform may support also the exchange of manual frequency Restoration Reserves (mFRR).
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs' local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs' imbalance needs.
Procédure
Type de procédure: Procédure négociée
Type de soumission: Soumission pour tous les lots
Critères d'attribution
Offre la plus économique
Pouvoir adjudicateur Identité
Pays: France 🇫🇷
Type de pouvoir adjudicateur: Service d'utilité publique
Nom du pouvoir adjudicateur: RTE Réseau de Transport d'Electricité
Adresse postale: 100 esplanade du Général de Gaulle
Code postal: 92932
Commune postale: Paris la Défense Cedex
Contact
Adresse Internet: http://www.rte-france.com🌏
Courrier électronique: charley.grare@rte-france.com📧
Téléphone: +33 179248034📞
Fax: +33 179248231 📠
URL des documents: http://www.rte-france.com/fr/contact/supplier🌏
Référence Dates
Date d'envoi: 2016-08-01 📅
Date limite de soumission: 2016-09-09 📅
Date de publication: 2016-08-05 📅
Identifiants
Numéro d'avis: 2016/S 150-271398
Numéro JO-S: 150
Informations complémentaires
Cannot be combined with Package F — ‘Testing activities’.
Objet Champ d'application du marché
Brève description:
TERRE is a pilot project set by ENTSO-E for cross-border exchanges of balancing reserves between Transmission System Operators (TSOs). It is one among several initiatives to implement the Electricity Balancing Guideline (network code).
6 European TSOs are directly involved as partners: National Grid (GB), REE (Spain), REN (Portugal), RTE (France), Swiss Grid (Switzerland) and TERNA (Italy). A 7th, ADMIE (Greece), acts as observer.
The short term objective of the TERRE platform is to support exchange of Replacement Reserves (RR) on a regional level. In a subsequent phase, the platform may support also the exchange of manual frequency Restoration Reserves (mFRR).
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs' local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs' imbalance needs.
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs' local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs' imbalance needs.
Nombre maximal de lots par soumissionnaire: 4
Informations sur les lots:
Packages related to "Design & Development (B1 and B2) and "Testing activities" (F) cannot be provided by the same supplier.
Intitulé du lot: Centralised platform: Optimisation module
Numéro du lot: B1
Brève description:
Services expected:
— Design & Development (target period of completion: 16 months);
— Support & Maintenance (to start from the ‘interoperability testing’ phase for a firm duration of 12 months).
The optimisation process is the core of the TERRE platform. This component receives the balancing offers, needs and available cross-border capacities, and using the mathematical equations developed by the TSOs, determines the best match of offers to be activated. The module also calculates the marginal price and resulting scheduled flows between the market balance areas.
The optimisation process is the core of the TERRE platform. This component receives the balancing offers, needs and available cross-border capacities, and using the mathematical equations developed by the TSOs, determines the best match of offers to be activated. The module also calculates the marginal price and resulting scheduled flows between the market balance areas.
The supplier of this component shall provide a realisation of the TSOs equations & optimisation rules in its own software package.
This component shall be developed in alignment with the data model and overall platform integration developed under package B2.
Durée de l'accord: 26 mois
Description des renouvellements: — Support & Maintenance: 2 x 12 months.
Description des options:
— Support & Maintenance: 2 x 12 months
— Hand-over: 3 months.
Informations complémentaires: Cannot be combined with Package F — ‘Testing activities’.
Intitulé du lot: Centralised platform: Data Management, Integration & Workflow, and GUI
Numéro du lot: B2
Brève description:
This package comprises all aspects of the platform described in the Business Requirements Summary document except for the optimisation module. Supplier of this work package is responsible for the overall architecture of the platform, integration with the optimisation module, GUI/presentation layer, data modelling and database design, data storage, and communication layer. Supplier of this work package will conduct system test and Factory Acceptance Test. User acceptance testing will be conducted by the supplier of Package F. Package B2 supplier is expected to collaborate with the testing supplier (Package F) to achieve User Acceptance testing and support both this and the interoperability testing stages.
This package comprises all aspects of the platform described in the Business Requirements Summary document except for the optimisation module. Supplier of this work package is responsible for the overall architecture of the platform, integration with the optimisation module, GUI/presentation layer, data modelling and database design, data storage, and communication layer. Supplier of this work package will conduct system test and Factory Acceptance Test. User acceptance testing will be conducted by the supplier of Package F. Package B2 supplier is expected to collaborate with the testing supplier (Package F) to achieve User Acceptance testing and support both this and the interoperability testing stages.
Description des options: — Support & Maintenance: 2 x 12 months,
Intitulé du lot: Hosting
Numéro du lot: C
Brève description:
— Physical hosting (to start from the ‘acceptance testing’ phase for a firm duration of 12 months).
This package comprises provision of 3 principal environments: internal test (for User Acceptance Testing and staging of revisions to the platform software), external test (for Interoperability Testing with TSOs) and production. Further environments may be required on an adhoc basis for simulation and scenario planning if internal or external test environments are not available. The provider of this package will manage the deployment process and the capability to set up an environment with a specified datum of reference and master data.
This package comprises provision of 3 principal environments: internal test (for User Acceptance Testing and staging of revisions to the platform software), external test (for Interoperability Testing with TSOs) and production. Further environments may be required on an adhoc basis for simulation and scenario planning if internal or external test environments are not available. The provider of this package will manage the deployment process and the capability to set up an environment with a specified datum of reference and master data.
Durée de l'accord: 12 mois
Description des renouvellements: — Hosting: 2 x 12 months.
Description des options: — Hosting: 2 x 12 months,
Intitulé du lot: Operation
Numéro du lot: D
Brève description:
— Operation (to start from the ‘interoperability testing’ phase for a firm duration of 12 months).
The supplier of this package takes responsibility for day-to-day responsibility for operation of the platform, according to the agreed operational model, including
— provision of first line support services (helpdesk, incident management etc.);
— routing of incidents to hosting or software support providers;
— control of the business process (start-stop of auctions, setting up of ad-hoc process steps etc. as instructed, in accordance with the governance regime defined by the TSOs).
Description des renouvellements: — Operation: 2 x 12 months.
Description des options: — Operation: 2 x 12 months,
Intitulé du lot: Testing activities
Numéro du lot: F
Brève description:
— Testing of the platform (to start from the ‘development’ phase for a firm duration of 12 months).
Supplier of this package will be responsible for planning and executing UAT, and for planning and facilitating interoperability testing between the platform and external systems. Part of the preliminary phase will be to participate in Factory Acceptance Tests which will be executed and facilitated by suppliers of development work packages B1/B2.
Supplier of this package will be responsible for planning and executing UAT, and for planning and facilitating interoperability testing between the platform and external systems. Part of the preliminary phase will be to participate in Factory Acceptance Tests which will be executed and facilitated by suppliers of development work packages B1/B2.
Supplier of this package will assess and validate the automated test suite produced by the supplier(s) of package B1/B2.
Informations complémentaires: Cannot be combined with Packages B1 and/or B2.
Informations juridiques, économiques, financières et techniques Conditions de participation
Habilitation à exercer l'activité professionnelle:
I) The candidate shall provide the following information (eliminatory):
— the company full legal name, address, country, registration number and Dun & Bradstreet (DUNS) number;
— a certificate of incorporation/registration dated within the last 3 months;
— proofs of its legal obligation fulfilment, including social security contributions and payment of taxes;
— a non-bankruptcy declaration;
— if so, the parent company full legal name, address, registration number and DUNS number.
ii) The candidate shall provide as additional information:
— technical and commercial contact details;
— list of relevant offices located in Europe;
— staff turnover rate over the last 3 years;
— details about potential / recent buyouts and mergers.
Situation économique et financière:
I) The candidate shall justify a turnover, over the last 3 financial years, representing at least (eliminatory):
— Package B1 8 000 K EUR;
— Package B2 6 750 K EUR;
— Package C 900 K EUR;
— Package D 900 K EUR;
— Package F 250 K EUR.
If the candidate intends to bid on several packages, the requested turnover shall represent or exceed the overall total.
ii) The candidate shall provide a memorandum of insurance justifying the covered amount by type of damages (eliminatory).
Capacité technique et professionnelle:
For each package the bidder is interested by, a PDF document of maximum 15 pages must be drafted in order to introduce the company (and the consortium if any) as well as the technical capability to meet the package's need, including the following minimum expected content (eliminatory):
For each package the bidder is interested by, a PDF document of maximum 15 pages must be drafted in order to introduce the company (and the consortium if any) as well as the technical capability to meet the package's need, including the following minimum expected content (eliminatory):
i) For development packages (B1 & B2), suppliers are expected to have the following capabilities:
— knowledge of electricity market CIM document standards (ISO-62325-451 series);
— know-how in implementing near-realtime market optimisation or capacity planning functions;
— knowledge and experience of a variety of middleware integration technologies and standards;
— knowledge and experience of communications standards based on web services, AMQP (Advanced Message Queuing Protocol).
ii) For hosting & operation packages (C & D), suppliers are expected to have the following capabilities:
— Tier 3 Data centre operation accredited to ISO 27001:2013 and 50001:2011.
iii) For testing (F):
— knowledge of electricity market CIM document standards (ISO-62325-451 series).
Exécution du marché
Dépôts et garanties exigés: If applicable, will be described in the tender documentation.
Forme juridique que devra revêtir le groupement d'opérateurs économiques attributaire du marché:
Applicants may bids as
(i) single company;
(ii) a consortium;
(iii) a prime contractor with proposed sub-contractors.
If an applicant is a consortium then the TERRE project members reserve the right to request that the liability for the consortium will be on a joint and several basis.
In the case of a consortium, each of the entities has to submit the documents mentioned above, including details of how they will operate as a consortium.
The TERRE project members reserve the right to…
… exclude consortium applicants who change partners part way through the process.
… demand at any time from the applicant evidence to the legal position of the consortium.
Additional conditions may be added in the tender documentation.
Procédure
Droit des marchés publics applicable: French.
Nombre minimum de candidats: 3
Heure limite de réception des offres: 11:00
Date d'envoi des invitations: 2016-10-07 📅
Langues dans lesquelles les offres ou les demandes de participation peuvent être présentées: anglais 🗣️
Période de validité de l'offre: 9 mois
Pouvoir adjudicateur Identité
Nom du pouvoir adjudicateur: National Grid
Adresse postale: Warwick Technology Park
Commune postale: Warwick
Code postal: CV34 6DA
Pays: Royaume-Uni 🇬🇧
Nom du pouvoir adjudicateur: REE Red Eléctrica de España
Adresse postale: Paseo del Conde de los Gaitanes, 177
Commune postale: Alcobendas
Code postal: 28109
Pays: Espagne 🇪🇸
Nom du pouvoir adjudicateur: REN Redes Energéticas Nacionais
Adresse postale: Avenida dos Estados Unidos da América 55
Commune postale: Lisboa
Code postal: 1749-061
Pays: Portugal 🇵🇹
Nom du pouvoir adjudicateur: Swissgrid AG
Adresse postale: Werkstraße 12
Commune postale: Laufenburg
Code postal: 5080
Pays: Suisse 🇨🇭
Nom du pouvoir adjudicateur: Terna SpA
Adresse postale: Viale Egidio Galbani 70
Commune postale: Roma
Code postal: 00156
Pays: Italie 🇮🇹 Contact
Point de contact: Charley Grare
Adresse Internet: www.rte-france.com🌏
: www.nationalgrid.com🌏
: www.ree.es🌏
: www.ren.pt🌏
: www.swissgrid.ch🌏
: www.terna.it🌏
URL des documents: http://www.rte-france.com/fr/contact/supplier🌏
Référence Informations complémentaires
Calendrier prévisionnel de publication des prochains avis:
Depending of the Packages' completion duration.
Excluding the Design & Development services, part of the Packages B1 & B2.
RTE is the Single Point of Contact (SPOC) throughout the entire procurement process.
Tenders will be required to be priced in EUR.
Informations complémentaires Organe de révision
Nom: Tribunal de grande instance de Nanterre
Adresse postale: 179-191 avenue Joliot-Curie
Commune postale: Nanterre Cedex
Code postal: 92020
Pays: France 🇫🇷
Téléphone: +33 140971010📞
Fax: +33 147243161 📠 Service auprès duquel des informations sur la procédure de recours peuvent être obtenues Identique à : Organe de révision
Source: OJS 2016/S 150-271398 (2016-08-01)
Informations complémentaires (2016-08-09) Objet Métadonnées de l'avis
Type de document: Informations complémentaires
Pouvoir adjudicateur Identité
Commune postale: Paris La Défense Cedex
Référence Dates
Date d'envoi: 2016-08-09 📅
Date de publication: 2016-08-11 📅
Identifiants
Numéro d'avis: 2016/S 154-278957
Se réfère à l'avis: 2016/S 150-271398
Numéro JO-S: 154
Pouvoir adjudicateur Identité
Adresse postale: Avenida dos Estados Unidos da América, 55
Werkstrasse 12
Viale Egidio Galbani, 70
Source: OJS 2016/S 154-278957 (2016-08-09)
Informations complémentaires (2016-08-23) Objet Champ d'application du marché
Brève description:
TERRE is a pilot project set by ENTSO-E for cross-border exchanges of balancing reserves between Transmission System Operators (TSOs). It is 1 among several initiatives to implement the Electricity Balancing Guideline (network code).
6 European TSOs are directly involved as partners: National Grid (GB), REE (Spain), REN (Portugal), RTE (France), Swiss Grid (Switzerland) and TERNA (Italy). A 7th, ADMIE (Greece), acts as observer.
The short term objective of the TERRE platform is to support exchange of Replacement Reserves (RR) on a regional level. In a subsequent phase, the platform may support also the exchange of manual frequency Restoration Reserves (mFRR).
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs' local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs' imbalance needs.
TERRE is a pilot project set by ENTSO-E for cross-border exchanges of balancing reserves between Transmission System Operators (TSOs). It is 1 among several initiatives to implement the Electricity Balancing Guideline (network code).
6 European TSOs are directly involved as partners: National Grid (GB), REE (Spain), REN (Portugal), RTE (France), Swiss Grid (Switzerland) and TERNA (Italy). A 7th, ADMIE (Greece), acts as observer.
The short term objective of the TERRE platform is to support exchange of Replacement Reserves (RR) on a regional level. In a subsequent phase, the platform may support also the exchange of manual frequency Restoration Reserves (mFRR).
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs' local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs' imbalance needs.
Référence Dates
Date d'envoi: 2016-08-23 📅
Date de publication: 2016-08-27 📅
Identifiants
Numéro d'avis: 2016/S 165-297553
Numéro JO-S: 165
Objet Champ d'application du marché
Brève description:
TERRE is a pilot project set by ENTSO-E for cross-border exchanges of balancing reserves between Transmission System Operators (TSOs). It is 1 among several initiatives to implement the Electricity Balancing Guideline (network code).
Source: OJS 2016/S 165-297553 (2016-08-23)
Informations complémentaires (2016-09-01) Pouvoir adjudicateur Identité
Nom du pouvoir adjudicateur: RTE réseau de transport d'électricité
Référence Dates
Date d'envoi: 2016-09-01 📅
Date de publication: 2016-09-06 📅
Identifiants
Numéro d'avis: 2016/S 171-307685
Numéro JO-S: 171
Informations complémentaires
Please consider when we are referring, from the TCO perspective, the definition of Operation (Package D) is IT Monitoring Platform.
Source: OJS 2016/S 171-307685 (2016-09-01)
Avis d'attribution de marché (2018-02-06) Objet Champ d'application du marché
Brève description:
TERRE is a pilot project set by ENTSO-E for cross-border exchanges of balancing reserves between Transmission System Operators (TSOs). It is one among several initiatives to implement the Electricity Balancing Guideline (network code).
6 European TSOs are directly involved as partners: National Grid (GB), REE (Spain), REN (Portugal), RTE (France), Swissgrid (Switzerland) and TERNA (Italy).
The short term objective of the TERRE platform is to support exchange of Replacement Reserves (RR) on a regional level. In a subsequent phase, the platform may support also the exchange of Manual Frequency Restoration Reserves (mFRR).
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs’ local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs’ imbalance needs.
TERRE is a pilot project set by ENTSO-E for cross-border exchanges of balancing reserves between Transmission System Operators (TSOs). It is one among several initiatives to implement the Electricity Balancing Guideline (network code).
6 European TSOs are directly involved as partners: National Grid (GB), REE (Spain), REN (Portugal), RTE (France), Swissgrid (Switzerland) and TERNA (Italy).
The short term objective of the TERRE platform is to support exchange of Replacement Reserves (RR) on a regional level. In a subsequent phase, the platform may support also the exchange of Manual Frequency Restoration Reserves (mFRR).
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs’ local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs’ imbalance needs.
Métadonnées de l'avis
Type de document: Avis d'attribution de marché
Réglementation: Union européenne
Procédure
Type de soumission: Sans objet
Référence Dates
Date d'envoi: 2018-02-06 📅
Date de publication: 2018-02-07 📅
Identifiants
Numéro d'avis: 2018/S 026-057587
Numéro JO-S: 26
Informations complémentaires
Cannot be combined with Package F — "Testing activities".
Objet Champ d'application du marché
Brève description:
6 European TSOs are directly involved as partners: National Grid (GB), REE (Spain), REN (Portugal), RTE (France), Swissgrid (Switzerland) and TERNA (Italy).
The short term objective of the TERRE platform is to support exchange of Replacement Reserves (RR) on a regional level. In a subsequent phase, the platform may support also the exchange of Manual Frequency Restoration Reserves (mFRR).
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs’ local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs’ imbalance needs.
The TERRE platform shall be capable of gathering in near-realtime all the offers for Replacement Reserves from participating TSOs’ local balancing markets and to provide, on a regional level, an optimised allocation of the reserves that will cover the TSOs’ imbalance needs.
— Design & Development (target period of completion: 16 months),
— Support & Maintenance (to start from the "interoperability testing" phase for a firm duration of 12 months).
Informations complémentaires: Cannot be combined with Package F — "Testing activities".
Brève description:
— Physical hosting (to start from the "acceptance testing" phase for a firm duration of 12 months).
Intitulé du lot: IT Monitoring
Brève description:
— IT Monitoting of the platform (to start from the "interoperability testing" phase for a firm duration of 12 months).
The supplier of this package takes responsibility for day-to-day responsibility for operation of the platform, according to the agreed operational model, including.
— provision of first line support services (helpdesk, incident management etc.),
— routing of incidents to hosting or software support providers,
— control of the business process (start-stop of auctions, setting up of ad-hoc process steps etc.as instructed, in accordance with the governance regime defined by the TSOs).
— Testing of the platform (to start from the "development" phase for a firm duration of 12 months).
Attribution du marché
Date de conclusion du contrat: 2018-02-01 📅
Nom: JV Epex-soops BV
Numéro d'enregistrement national: 50502905
Commune postale: Amsterdam
Pays: Pays-Bas 🇳🇱
Nom: SOOPS Investment BV
Numéro d'enregistrement national: 34148798
Nom: Soops BV
Numéro d'enregistrement national: 33240368
Nom: Artelys SAS
Numéro d'enregistrement national: 428895676
Commune postale: Paris
Pays: France 🇫🇷
Nom: Unicorn System SAS
Numéro d'enregistrement national: 25110853
Commune postale: Prague
Pays: Tchéquie 🇨🇿
Nom: Accenture SAS
Numéro d'enregistrement national: 732075312
Pouvoir adjudicateur Identité
Nom du pouvoir adjudicateur: National Grid Electricity Transmission
Commune postale: Alcobendas (Madrid)
Nom du pouvoir adjudicateur: REN Redes Eléctrica Nacional, SA
Référence Informations complémentaires
Lots C (Hosting Services) and D (IT Monitoring) are subject to separate procurement events: