Transportation and installation of the Offshore wind turbines on Fecamp, Courseulles-sur-Mer and Saint-Nazaire's offshore wind farms
The scope of work consists in the load-out, transportation from assembly hubs to the Offshore Sites and the installation of Wind Turbines Generators:
— lot 1 — Transportation and installation of the Offshore wind turbines on the Fecamp site,
— lot 2 — Transportation and installation of the Offshore wind turbines on the Courseulles-sur-Mer site,
— lot 3 — Transportation and installation of the Offshore wind turbines on the Saint-Nazaire site.
Date limite
Le délai de réception des offres était de 2015-05-28.
L'appel d'offres a été publié le 2015-05-06.