Transportation and installation of the Offshore wind turbines on Courseulles-sur-Mer, Fécamp and Saint-Nazaire's offshore wind farms
The scope of work consists of the load-out, transportation from assembly hubs to the Offshore Site and the installation of approximately 238 Wind Turbines Generators split in approximately 83 for Fécamp, approximately 75 for Courseulles-sur-mer, approximately 80 for St-Nazaire wind farms.