Completion of maintenance grading and layout of the track
Completion of maintenance grading and layout of the track by operations of tamping dressage heavy mechanical railway and switches maximum tangent 1/21 with concrete sleepers on the French and UK terminals. The company is also in charge of making preparations of the tamping / heavy mechanical dressage (mapping), work tamping and assistance upstream and downstream machines. Eurotunnel organize approximately two campaigns per year.
Date limite
Le délai de réception des offres était de 2014-02-07.
L'appel d'offres a été publié le 2014-01-21.