Completion of maintenance grading and layout of the track

Eurotunnel

Completion of maintenance grading and layout of the track by operations of tamping dressage heavy mechanical railway and switches maximum tangent 1/21 with concrete sleepers on the French and UK terminals. The company is also in charge of making preparations of the tamping / heavy mechanical dressage (mapping), work tamping and assistance upstream and downstream machines. Eurotunnel organize approximately two campaigns per year.

Date limite
Le délai de réception des offres était de 2014-02-07. L'appel d'offres a été publié le 2014-01-21.

Qui ?

Qu'est-ce que c'est ?

Historique des marchés publics
Date Document
2014-01-21 Avis de marché