The design, manufacture, supply and installation of new machine-welded metal floor extremities for the BREDA "1st generation" HGV carrying railway wagons and removal of the existing floors

Eurotunnel

The design, manufacture, supply and installation of new machine-welded metal floor extremities for the BREDA "1st generation" HGV carrying railway wagons and removal of the existing floors.
The Contractor is responsible for:
— Analysing documents transmitted,
— On-site surveys,
— Full detailed and working designs,
— Design calculations,
— Drawings and manufacturing packages,
— Dismantling underbody equipment on the ET site (if necessary),
— Reassembling underbody equipment in its original position (if necessary),
— Corresponding painting,
— Checks,
—Tests,
— Full-scale production,
— Procurement of end floor components.
Timing: 1 to 3 vehicles a week in accordance with the programme.

Date limite
Le délai de réception des offres était de 2013-06-20. L'appel d'offres a été publié le 2013-06-04.

Fournisseurs
Les fournisseurs suivants sont mentionnés dans les décisions d'attribution ou dans d'autres documents relatifs aux marchés publics :
Qui ?

Qu'est-ce que c'est ?

Historique des marchés publics
Date Document
2013-06-04 Avis de marché
2014-06-23 Avis d'attribution de marché