Replacement of 41 locomotive air-conditioning sets
Eurotunnel has a fleet of 41 air-conditioning sets fitted to its locomotives. These air-conditioning sets use a R22 refrigerant which can no longer be used in air-conditioning sets from 1.1.2015. The task involves conducting a study and the replacement by 41 new air-conditioning sets.
Date limite
Le délai de réception des offres était de 2013-12-16.
L'appel d'offres a été publié le 2013-11-29.
Qui ?
Qu'est-ce que c'est ?
Historique des marchés publics
Date |
Document |
2013-11-29
|
Avis de marché
|