ERA 2013 20 INTEROP OP 'Study on universal overhead contact line design "phase 2"'

European Railway Agency

The European Railway Agency is in charge to develop and review technical specifications for interoperability (TSIs), according to Interoperability Directive 2008/57/EC.
Among subsystems covered by TSIs is the energy subsystem defined in the Annex II point 2.2 of the Interoperability Directive (as amended by Annex I of the Directive 2011/18/EU). In this Annex, 'overhead lines' are included in the energy subsystem.
This is the continuity of the study titled: 'Study on interface Euro/1950-pantographs and OCL design' which was performed in year 2013. The aim of this study is to define necessary conditions and requirements for OCL design to accept both 1600 and 1950 pantograph.
This phase of the study will be executed in years 2014 and 2015.

Date limite
Le délai de réception des offres était de 2014-02-07. L'appel d'offres a été publié le 2013-12-05.

Fournisseurs
Les fournisseurs suivants sont mentionnés dans les décisions d'attribution ou dans d'autres documents relatifs aux marchés publics :
Qui ?

Qu'est-ce que c'est ?

Historique des marchés publics
Date Document
2013-12-05 Avis de marché
2014-04-15 Avis d'attribution de marché