Coupler drawbar replacement on Eurotunnel shuttles coupling system

Eurotunnel

Coupler drawbar replacement on Eurotunnel shuttles coupling system.
The operation will take place on the Coquelles site between 2014 and 2016.
The operation consists in the maintenance of the coupling system on EUROTUNNEL shuttles
a) Disassembly and reassembly of 638 coupling systems according to our maintenance procedures.
b) Revision of 141 couplers type 10, 297 couplers type SP and 98 couplers according to our maintenance procedures
c) Replacement of 576 coupler drawbars according to our maintenance procedures.
d) Replacement of 182 couplers type 110 by the coupler type SP according to our maintenance procedures .
e) CP and CG flexible replacement according to our maintenance procedures.
f) Provision of gear and tools for the realization of the work.

Date limite
Le délai de réception des offres était de 2013-08-01. L'appel d'offres a été publié le 2013-07-11.