Rail Fastening Parts : Spring Blade for Rail Fastening

Eurotunnel

Eurotunnel will start a rerailing in the tunnels campaign from september 2013 over a average period of 36 months.
For this operation the needs of 550 000 lower and upper spring +/- 20 % will be necessary over the 36 months on the basis of a detailed planning which will be included in the tender.
For information the first delivery of parts will be in July 2013 for an average quantity of 15 % of the total , the remaining being splitted over the 36 months.
For the elastic parts and isolant parts the technical specifications will give details of the norms to be followed.
For steel parts it will be the same but it is also important to take into account that the tenderers will have to be able to provide parts with specific anti corrosion protection.
The tenderers should be able to provide references for equivalent parts supply in a European Railway Network as Sncf Railtrack... or having already been a Eurotunnel supplier for the same type of parts.

Date limite
Le délai de réception des offres était de 2013-01-15. L'appel d'offres a été publié le 2012-12-14.

Qui ?

Qu'est-ce que c'est ?

Où ?
  • • South East (England) › Kent

Historique des marchés publics
Date Document
2012-12-14 Avis de marché