UK/PE 61O1 - various pumps procurement for UK and Penly 3. EPR projects

EDF SA - Acting in its own name and in the name and on the behalf of its affiliated companies

Within the framework of the construction of 2 to 4 EPR units (2 firm units on Hinkley Point, Somerset, UK, and 2 options with 1 EPR unit per option) and 1 EPR unit in Penly (1 firm unit), the purpose of the contract is the complete supply of lower than 160 kW power various pumps, operating in different systems of the EPR unit.
Main characteristics & functions are described in the joined PQQ and could be modified for the next Invitation To Tender.
These scopes of works for the proposed contract include: studies, procurement, manufacturing, ancillaries, control, factory tests, and:
— erection, on site tests and commissioning (Penly Lot),
— erection supervision and commissioning assistance (UK Lot).
Penly lot option:
— 1 option Supply only spares.
UK lot options:
— 2 options Supply complete pump packages and Erection supervision & Commissioning assistance in UK,
— 1 option Supply only spares.

Date limite
Le délai de réception des offres était de 2011-02-23. L'appel d'offres a été publié le 2011-02-01.

Qui ?

Qu'est-ce que c'est ?

Historique des marchés publics
Date Document
2011-02-01 Avis de marché