UK/PE 5111. EPR projects - LV switchboards (690V AC, 400V AC, 220V DC) and MV/LV and LV/LV dry-type transformers

EDF SA - Acting in its own name and in the name and on behalf of any of its affiliated companies

The scope of this contract concerns mainly the supply of LV switchboards:
·690 V AC.
·400 V AC.
·220 V DC.
As well as mainly the supply of following MV/LV and LV/LV dry-type transformers:
·10 kV/0.72 kV.
·10 kV/0.42 kV.
·0.69kV/0.42 kV.
·0.4 kV/0.4 kV (voltage stabilized transformers).
The scope of works for the referenced contracts UK/PE 5111 includes the following steps:
1) UK lot (UK 5111):
Design and manufacturing engineering studies, technical qualification of products, procurement, manufacturing, quality controls and tests made at workshop, deliveries to site(s), installation supervision and commissioning supervision, specific technical field assistance, spare parts supply for nuclear and conventional island for 2 EPR power plants located in Hinckley point C1 & C2, Somerset - England (2 units) and optional 2 other units for other nuclear power plant in the UK.
Installation and commissioning on site are included in other contracts.
2) French lot (PE 5111):
Design and manufacturing engineering studies, technical qualification of products, procurement, manufacturing, quality controls and tests made at workshop, deliveries to site, installation and commissioning on site, specific technical field assistance, spare parts supply for nuclear and conventional island for one EPR power plant located in Penly, Northern France (1 unit).
All quantities and characteristics of devices are indicative and are likely to change. It does not constitute a commitment.

Date limite
Le délai de réception des offres était de 2011-03-24. L'appel d'offres a été publié le 2011-02-23.

Qui ?

Qu'est-ce que c'est ?

Historique des marchés publics
Date Document
2011-02-23 Avis de marché
2012-07-11 Informations complémentaires