Supply of rail (UIC 60 kg)
Suplly of rail (UIC 60 kg) for operations of replacement planned on Eurotunnel site: railways terminals.
Year 2011 requirement:
French and UK Railways terminals:
Rail UIC 60 E1 / normal nuance / grade 260.
Lenghts (will be defined in tender technical documents).
Quantity: 1 400 m.
Rail UIC 60 E1 / thermic treatment / grade 350 LHT or hardeness (will be defined in tender technical documents if needed)).
Lenghts (will be defined in tender technical documents).
Quantity: 4 000 m.
Delivery period: August 2011.
Year 2012 requirement:
French and UK Railways terminals:
Rail UIC 60 E1 / normal nuance / grade 260.
Lenghts (will be defined in tender technical documents).
Quantity: 200 m.
Rail UIC 60 E1 / thermic treatment / grade 350 LHT or hardeness (will be defined in tender technical documents if needed).
Lenghts (will be defined in tender technical documents).
Quantity: 6 000 m.
2012 delivery period: not defined at this step.
Norms and standards applicables:
In accordance with: EN13674-1 / UIC standards (notice 860.0 last edition).
All quantity given for 2011 and 2012 requirement are indicative and could be updated in adequation with the final commercial exploitation need.
Date limite
Le délai de réception des offres était de 2011-05-10.
L'appel d'offres a été publié le 2011-04-21.
Qui ?
Qu'est-ce que c'est ?
Historique des marchés publics
Date |
Document |
2011-04-21
|
Avis de marché
|