Supply and installation of compressor motor assemblies on the Eurotunnel's double deck loader wagons
For a project of supression of the supply of the catenary on platform of loading, Eurotunnel wishes to modify the production of compressed air of these shuttles. The project is divised into 2 lots:
Lot 1:
— supply and installation of 20 (+/- 15 %) compressor motor assemblies on the double deck loader wagons.
Lot 2:
— installation of 19 (+/- 15 %) compressor motor assemblies in the undercarriage of the double deck loading wagons,
— electrical modification of the wagon for compressort motor assembly electrical supply purposes,
— mechanical modification of the wagon for installation of the compressor motor assembly,
— connection of the compressor motor assembly to the wagon air circuits.
Date limite
Le délai de réception des offres était de 2011-05-16.
L'appel d'offres a été publié le 2011-04-15.
Qui ?
Qu'est-ce que c'est ?
Historique des marchés publics
Date |
Document |
2011-04-15
|
Avis de marché
|
2011-04-29
|
Informations complémentaires
|