Restoration to operational service of 14 ‘tourist’ shuttle railway wagons destined for the transportation of road vehicles

Eurotunnel

Eurotunnel seeks to restore to normal operational service 14 Tourist shuttle railway wagons which have been removed from service and immobilised on the ET Coquelles Site since 2005.
At the time of the « cocooning » of these wagons, partial dismantling operations have taken place with the removal of different equipment and components for use as spare parts or put into storage.
The operation consists in the restoration to operational commercial service of the concerned wagons;-.
— 1 Single deck loader (SDL) Wagon + 6 Single deck carrier (SDC) wagons,
— 1 Double deck loader (DDL) wagon + 6 Double deck carrier (DDC) wagons.
Their restoration to full operational commercial service is foreseen for May 2012.
The majority of the equipment, cabling, conduits, underfloor piping, has been dismantled, disassembled, and either stored or used as spare part replacement on operational wagons.
In the wagon interiors, numerous equipment and components have been dismounted and stored or used as spare part replacement on operational wagons.
The works will be performed on the Eurotunnel Site at Coquelles and a workshop will be made available to this effect.
The contract will be divided into several Lots.
All technical specification and technical documents will be available in French language.
French law will be applicable.

Date limite
Le délai de réception des offres était de 2011-02-18. L'appel d'offres a été publié le 2011-02-03.

Qui ?

Qu'est-ce que c'est ?

Historique des marchés publics
Date Document
2011-02-03 Avis de marché