Operations of rail replacement on Eurotunnel railway network

France Manche et Channel Tunnel Group, agissant solidairement dans le cadre d'une société en participation sous le nom Eurotunne

Operations of replacement of rail UIC 60 kg on Eurotunnel railway network place of works: both sites - French and English railways terminals works consist to replace the rails and the fastenings 5360 meters of rail need to be replaced (3280 m on UK site, 2080 m on FR site) work planning: works are planned in september and october (year 2011).
The main tracks at the Concession are fitted with rails weighing 60 kg/m of various lengths.
Design of the track: NABLA flexible fastenings (rail clips or elastic clips depending on the type of sleeper (wooden for a radius of less than 1000 m – VAX U41 concrete bi-block – VAX U31 concrete bi-block sleepers)).
Fluted soleplates under the rail 4.5 mm or 9 mm in depth (TBA – TB).
— Switches and crossings in France with a different tangent: Tg 0.11 – 0.085 – 0.0654 – 0.0476 – 0.0336 – 0.0372,
— Switches and crossings in UK with a different tangent: TG UD 10.75 – UF 18.5 – UE 15 – SUG 21 – 0.0336.
Services to be provided by the contractor:
— planning and logistics,
— defining inter-track spaces on site for lengths > 50 m for replacement rails,
— unloading of rails,
— removal of small equipment,
— removal of rails,
— cleaning of sleeper surfaces,
— laying of new rails and soleplates,
— fitting of fastenings,
— welding of rails and “martelage”,
— removal of materials,
— de-scaling of the rail,
— replacement of defective fastenings,
— making good of the profile of the ballast,
— releasing of cwr stresses,
— incorporation of switches and crossings,
— drawings and technical documents.

Date limite
Le délai de réception des offres était de 2011-05-24. L'appel d'offres a été publié le 2011-05-12.

Qui ?

Qu'est-ce que c'est ?

Historique des marchés publics
Date Document
2011-05-12 Avis de marché