One contract per lot: 1) UK 2621 (UK lot): studies, supply, manufacturing, test, transport, erection and commissioning of the spent fuel cask transfer facility (SFCTF) for 2 units for Hinckley Point, Somerset, England; 2) PE 2621 (French lot): studies, supply, manufacturing, test, transport, erection and commissioning of spent fuel cask transfer facility (SFCTF) for one unit for Penly, northern of France

EDF S.A., and NNB, a British company affiliated, mandating EDF S.A. to act in its own name and its behalf.

The SFCTF includes 2 parts:
— The fixed equipments: rails and lateral guiding rails, docking flange of the penetration, biological lid handling station, manoeuvring system for the upper cover of the penetration,
— The mobile part: the spent fuel cask transfer machine (trolley).
There is 1 contract per lot:
1) UK 2621 (UK lot) studies, supply, manufacturing, test, transport, erection and commissioning of spent fuel cask transfer facility (SFCTF), for:
— Hinckley Point nuclear power plant, 2 units are firm (2 units of fixed equipment and 1 trolley),
— other nuclear power plants in the UK, 2 units are optional:
a) Option 1: supply one set fixed equipments and one trolley, including, the design, the supply, the manufacturing, the tests, the transport, the erection and the commissioning for an other site in UK,
b) Option 2: supply one set fixed equipments, including, the design, the supply, the manufacturing, the tests, the transport, the erection and the commissioning for a second EPR unit. The supply of another trolley depends on the choice of the site (if it is the same site as the option 1, the trolley is not required).
2) PE 2621 (French lot) studies, supply, manufacturing, test, transport, erection and commissioning of spent fuel cask transfer facility (SFCTF) for Penly in northern France (1 trolley and 1 fixed equipment).

Date limite
Le délai de réception des offres était de 2011-01-24. L'appel d'offres a été publié le 2011-01-04.

Qui ?

Qu'est-ce que c'est ?

Historique des marchés publics
Date Document
2011-01-04 Avis de marché