2 lots: 1) UK 2221: equipment hatch for hinkley point (England) new nuclear power plant (twin-reactor site): 2 equipment hatches for 2 units. 2) PE 2221: equipment hatch for Penly (France) new nuclear power plant (single reactor site): 1 equipment hatch for 1 unit
The scope of works for the proposed contracts includes:
1) UK 2221: studies, supply, qualification, manufacturing, and associated controls, delivery, erection, commissioning and on-site testing for 2 equipment hatches for 2 units at Hinkley point new nuclear power plant (twin-reactor site)
2) PE 2221: studies, supply, qualification, manufacturing, and associated controls, delivery, erection, commissioning and on-site testing for 1 equipment hatch for Penly 3 new nuclear power plant (single reactor site)
The equipment hatch is lined with a steel sleeve, which is closed by a large removable metallic cap, and fitted inside of the internal HR containment. It allows accesses of heavy pieces of equipment during construction stages.
Further information and details are filled in the appendix A of the PQQ.
Date limite
Le délai de réception des offres était de 2011-03-03.
L'appel d'offres a été publié le 2011-02-03.
Qui ?
Qu'est-ce que c'est ?
Historique des marchés publics
Date |
Document |
2011-02-03
|
Avis de marché
|
2011-02-23
|
Informations complémentaires
|