2 lots: 1) UK 2211: HR airlocks for hinkley point (England) new nuclear power plant (twin-reactor site): 2 HR airlocks (personnal and emergency exit) for 1 unit. Total: 4 airlocks for 2 units. 2) PE 2211: HR airlocks for Penly (France) new nuclear power plant (single reactor site): 2 airlocks (personnal and emergency exit) for 1 unit

EDF SA - Acting in its own name and in the name and on behalf of its affiliated companies

The scope of works for the proposed contracts includes:
1) UK 2211: studies, supply, qualification, manufacturing, and associated controls, delivery, erection, commissioning and on-site testing for 4 airlocks for 2 units at Hinkley point new nuclear power plant (twin-reactor site) (2 airlocks per unit)
2) PE 2211: studies, supply, qualification, manufacturing, and associated controls, delivery, erection, commissioning and on-site testing for 2 airlocks for Penly 3 new nuclear power plant (single reactor site)
EPR HR airlocks are used for the traffic of the personnel as well as small equipments, whatever the state of the nuclear power pant, without affecting the containment of the enclosure. The personal HR airlock is erected in the reactor building at level +1,5m, the emergency exit HR airlock at level +19,5m. Both airlocks are identical. They are part of the third containment barrier.
Further information and details are filled in the appendix A of PQQ.

Date limite
Le délai de réception des offres était de 2011-03-03. L'appel d'offres a été publié le 2011-02-03.