2 lots: 1) PE 4261: Solid waste treatment, for Penly 3 (France) nuclear power plant (single reactor site) 2) UK 4261: solid waste treatment, for Hinckley Point (England) nuclear power plant (twin-reactor site)
The scope of work for the proposed contracts includes:
1) PE 4261: studies,supply,manufacturing,delivery, erection and commissioning for the treatment of solid radioactive waste for Penly 3 (France) nuclear power plant (single reactor site)
2) UK 4261 (UK lot): studies, supply, manufacturing,delivey, erection and commissioning for the treatment of solid radioactive waste for Hinckley Point (England) HPC1&HPC2 nuclear power plant (twin-reactor site) and for other nuclear power plants in the UK, 2 units are optional
Further information and details are given in the appendix A of the PQQ.
Date limite
Le délai de réception des offres était de 2011-04-05.
L'appel d'offres a été publié le 2011-03-03.
Qui ?
Qu'est-ce que c'est ?
Historique des marchés publics
Date |
Document |
2011-03-03
|
Avis de marché
|